{"id":47992,"date":"2022-04-02T16:06:20","date_gmt":"2022-04-02T16:06:20","guid":{"rendered":"https:\/\/assignmenttutors.net\/blog\/dont-tell-me-weve-lost-another-bid-exclaimed-sandy-kovallas\/"},"modified":"2022-04-02T16:06:20","modified_gmt":"2022-04-02T16:06:20","slug":"dont-tell-me-weve-lost-another-bid-exclaimed-sandy-kovallas","status":"publish","type":"post","link":"https:\/\/assignmenttutors.net\/blog\/dont-tell-me-weve-lost-another-bid-exclaimed-sandy-kovallas\/","title":{"rendered":"&#8220;don&#8217;t tell me we&#8217;ve lost another bid!&#8221; exclaimed sandy kovallas,"},"content":{"rendered":"<div>\n<p>&#8220;Don&#8217;t tell me we&#8217;ve lost another bid!&#8221; exclaimed Sandy Kovallas, president of Lenko Products, Inc. &#8220;I&#8217;m afraid so,&#8221; replied Doug Martin, the operations vice president. &#8220;One of our competitors underbid us by about $10,200 on the Hastings job.&#8221; &#8220;I just can\u2019t figure it out,&#8221; said Kovallas. &#8220;It seems we\u2019re either too high to get the job or too low to make any money on half the jobs we bid anymore. What\u2019s happened?&#8221;<\/p>\n<p>\u00a0\u00a0\u00a0\u00a0<\/p>\n<table width=\"620\">\n<tbody>\n<tr>\n<td>\n<p>\u00a0\u00a0\u00a0\u00a0\u00a0Lenko Products manufactures specialized goods to customers&#8217; specifications and operates a job-order costing system. Manufacturing overhead cost is applied to jobs on the basis of direct labor cost. The following estimates were made at the beginning of the year:<\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>\u00a0\u00a0\u00a0\u00a0<\/p>\n<table width=\"520\">\n<tbody>\n<tr>\n<td>\u00a0<\/td>\n<td colspan=\"6\">Department<\/td>\n<td colspan=\"2\">\u00a0<\/td>\n<\/tr>\n<tr>\n<td>\u00a0<\/td>\n<td colspan=\"6\">\n<hr\/>\n<\/td>\n<td colspan=\"2\">\u00a0<\/td>\n<\/tr>\n<tr>\n<td>\u00a0<\/td>\n<td colspan=\"2\">Cutting \u00a0<\/td>\n<td colspan=\"2\">Machining \u00a0<\/td>\n<td colspan=\"2\">Assembly \u00a0<\/td>\n<td colspan=\"2\">Total Plant<\/td>\n<\/tr>\n<tr>\n<td width=\"34%\">\u00a0\u00a0Direct labor<\/td>\n<td width=\"3%\">$<\/td>\n<td width=\"13%\">306,000 \u00a0\u00a0\u00a0\u00a0<\/td>\n<td width=\"3%\">$<\/td>\n<td width=\"13%\">202,000 \u00a0\u00a0\u00a0\u00a0<\/td>\n<td width=\"3%\">$<\/td>\n<td width=\"13%\">414,000 \u00a0\u00a0\u00a0\u00a0<\/td>\n<td width=\"3%\">$<\/td>\n<td width=\"14%\">922,000 \u00a0\u00a0<\/td>\n<\/tr>\n<tr>\n<td width=\"34%\">\u00a0\u00a0Manufacturing overhead<\/td>\n<td width=\"3%\">$<\/td>\n<td width=\"13%\">530,000 \u00a0\u00a0\u00a0\u00a0<\/td>\n<td width=\"3%\">$<\/td>\n<td width=\"13%\">831,760 \u00a0\u00a0\u00a0\u00a0<\/td>\n<td width=\"3%\">$<\/td>\n<td width=\"13%\">95,000 \u00a0\u00a0\u00a0\u00a0<\/td>\n<td width=\"3%\">$<\/td>\n<td width=\"14%\">1,456,760 \u00a0\u00a0<\/td>\n<\/tr>\n<tr>\n<td colspan=\"9\" width=\"100%\">\n<hr\/>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>\u00a0\u00a0\u00a0\u00a0<\/p>\n<table width=\"620\">\n<tbody>\n<tr>\n<td>\n<p>\u00a0\u00a0\u00a0\u00a0\u00a0Jobs require varying amounts of work in the three departments. The Hastings job, for example, would have required manufacturing costs in the three departments as follows:<\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>\u00a0\u00a0\u00a0\u00a0<\/p>\n<table width=\"500\">\n<tbody>\n<tr>\n<td>\u00a0<\/td>\n<td colspan=\"6\">Department<\/td>\n<td colspan=\"2\">\u00a0<\/td>\n<\/tr>\n<tr>\n<td>\u00a0<\/td>\n<td colspan=\"6\">\n<hr\/>\n<\/td>\n<td colspan=\"2\">\u00a0<\/td>\n<\/tr>\n<tr>\n<td>\u00a0<\/td>\n<td colspan=\"2\">Cutting<\/td>\n<td colspan=\"2\">Machining<\/td>\n<td colspan=\"2\">Assembly<\/td>\n<td colspan=\"2\">Total Plant<\/td>\n<\/tr>\n<tr>\n<td width=\"44%\">\u00a0\u00a0Direct materials<\/td>\n<td width=\"2%\">$<\/td>\n<td width=\"12%\">11,900 \u00a0\u00a0\u00a0<\/td>\n<td width=\"2%\">$<\/td>\n<td width=\"12%\">900 \u00a0\u00a0\u00a0\u00a0<\/td>\n<td width=\"2%\">$<\/td>\n<td width=\"12%\">5,600 \u00a0\u00a0\u00a0\u00a0<\/td>\n<td width=\"2%\">$<\/td>\n<td width=\"12%\">18,400 \u00a0\u00a0<\/td>\n<\/tr>\n<tr>\n<td>\u00a0\u00a0Direct labor<\/td>\n<td>$<\/td>\n<td>6,600 \u00a0\u00a0\u00a0<\/td>\n<td>$<\/td>\n<td>1,700 \u00a0\u00a0\u00a0\u00a0<\/td>\n<td>$<\/td>\n<td>12,900 \u00a0\u00a0\u00a0\u00a0<\/td>\n<td>$<\/td>\n<td>21,200 \u00a0\u00a0<\/td>\n<\/tr>\n<tr>\n<td>\u00a0\u00a0Manufacturing overhead<\/td>\n<td>\u00a0<\/td>\n<td>? \u00a0\u00a0\u00a0\u00a0<\/td>\n<td>\u00a0<\/td>\n<td>? \u00a0\u00a0\u00a0\u00a0\u00a0\u00a0<\/td>\n<td>\u00a0<\/td>\n<td>? \u00a0\u00a0\u00a0\u00a0<\/td>\n<td>\u00a0<\/td>\n<td>?<\/td>\n<\/tr>\n<tr>\n<td colspan=\"9\">\n<hr\/>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>\u00a0\u00a0\u00a0\u00a0<\/p>\n<table width=\"620\">\n<tbody>\n<tr>\n<td>The company uses a plantwide overhead rate to apply manufacturing overhead cost to jobs.<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>\u00a0\u00a0\u00a0\u00a0<\/p>\n<table width=\"620\">\n<tbody>\n<tr>\n<td colspan=\"2\"><strong>Required:<\/strong><\/td>\n<\/tr>\n<tr>\n<td width=\"3%\">1.<\/td>\n<td width=\"97%\">Assuming the use of a plantwide overhead rate:<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>\u00a0<\/p>\n<table width=\"620\">\n<tbody>\n<tr>\n<td width=\"3%\">a.<\/td>\n<td width=\"97%\">\n<p>Compute the rate for the current year.<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td width=\"2%\">\u00a0<\/td>\n<td width=\"98%\">\u00a0<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 <\/p>\n<table width=\"620\">\n<tbody>\n<tr>\n<td width=\"3%\">b.<\/td>\n<td width=\"97%\">\n<p>Determine the amount of manufacturing overhead cost that would have been applied to the Hastings job.<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td width=\"3%\">\u00a0<\/td>\n<td width=\"97%\">\u00a0<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0<a rel=\"nofollow noopener\" target=\"_blank\" style=\"display: none;\"> <\/p>\n<table width=\"620\">\n<tbody>\n<tr>\n<td width=\"3%\">2.<\/td>\n<td width=\"97%\">\n<p>Suppose that instead of using a plantwide overhead rate, the company had used a separate predetermined overhead rate in each department. Under these conditions:<\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>\u00a0\u00a0\u00a0\u00a0\u00a0<\/p>\n<table width=\"620\">\n<tbody>\n<tr>\n<td width=\"3%\">a.<\/td>\n<td width=\"97%\">Compute the rate for each department for the current year.<\/td>\n<\/tr>\n<tr>\n<td width=\"3%\">\u00a0<\/td>\n<td width=\"97%\">\u00a0<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0<a rel=\"nofollow noopener\" target=\"_blank\" style=\"display: none;\"> <\/p>\n<table width=\"620\">\n<tbody>\n<tr>\n<td width=\"3%\">b.<\/td>\n<td width=\"97%\">\n<p>Determine the amount of manufacturing overhead cost that would have been applied to the Hastings job. <span><strong>(Round your intermediate calculations to the nearest percent.)<\/strong><\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td width=\"3%\">\u00a0<\/td>\n<td width=\"97%\">\u00a0<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0<a rel=\"nofollow noopener\" target=\"_blank\" style=\"display: none;\"> <\/p>\n<table width=\"620\">\n<tbody>\n<tr>\n<td width=\"3%\">4.<\/td>\n<td width=\"97%\">\n<p>Assume that it is customary in the industry to bid jobs at 150% of total manufacturing cost (direct materials, direct labor, and applied overhead). <span><strong>(Round your intermediate calculations to the nearest percent.)<\/strong><\/span><\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>\u00a0<\/p>\n<table width=\"620\">\n<tbody>\n<tr>\n<td width=\"3%\">a.<\/td>\n<td width=\"97%\">\n<p>What was the company&#8217;s bid price on the Hastings job if plantwide overhead rate had been used to apply overhead cost?<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td width=\"3%\">\u00a0<\/td>\n<td width=\"97%\">\u00a0<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0<a rel=\"nofollow noopener\" target=\"_blank\" style=\"display: none;\"> <\/p>\n<table width=\"620\">\n<tbody>\n<tr>\n<td width=\"3%\">b.<\/td>\n<td width=\"97%\">\n<p>What would the bid price have been if departmental overhead rates had been used to apply overhead cost?<\/p>\n<\/td>\n<\/tr>\n<tr>\n<td width=\"3%\">\u00a0<\/td>\n<td width=\"97%\">\u00a0<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0<a rel=\"nofollow noopener\" target=\"_blank\" style=\"display: none;\"> \u00a0\u00a0\u00a0\u00a0<\/p>\n<table width=\"620\">\n<tbody>\n<tr>\n<td width=\"3%\">5.<\/td>\n<td width=\"97%\">\n<p>At the end of the year, the company assembled the following actual cost data relating to all jobs worked on during the year:<\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0<\/p>\n<table width=\"500\">\n<tbody>\n<tr>\n<td>\u00a0<\/td>\n<td colspan=\"6\">\n<p>Department<\/p>\n<\/td>\n<td colspan=\"2\">\u00a0\u00a0<\/td>\n<\/tr>\n<tr>\n<td>\u00a0<\/td>\n<td colspan=\"2\">Cutting<\/td>\n<td colspan=\"2\">Machining<\/td>\n<td colspan=\"2\">Assembly<\/td>\n<td colspan=\"2\">Total plant<\/td>\n<\/tr>\n<tr>\n<td width=\"36%\">\u00a0\u00a0Direct materials<\/td>\n<td width=\"2%\">$<\/td>\n<td width=\"14%\">761,000 \u00a0\u00a0<\/td>\n<td width=\"2%\">$<\/td>\n<td width=\"14%\">90,000 \u00a0\u00a0<\/td>\n<td width=\"2%\">$<\/td>\n<td width=\"14%\">409,000 \u00a0\u00a0<\/td>\n<td width=\"2%\">$<\/td>\n<td width=\"14%\">1,260,000 \u00a0\u00a0<\/td>\n<\/tr>\n<tr>\n<td>\u00a0\u00a0Direct labor<\/td>\n<td>\u00a0<\/td>\n<td>321,000 \u00a0\u00a0<\/td>\n<td>\u00a0<\/td>\n<td>210,000 \u00a0\u00a0<\/td>\n<td>\u00a0<\/td>\n<td>340,000 \u00a0\u00a0<\/td>\n<td>\u00a0<\/td>\n<td>871,000 \u00a0\u00a0<\/td>\n<\/tr>\n<tr>\n<td>\u00a0\u00a0Manufacturing overhead<\/td>\n<td>$<\/td>\n<td>561,000 \u00a0\u00a0<\/td>\n<td>$<\/td>\n<td>830,000 \u00a0\u00a0<\/td>\n<td>$<\/td>\n<td>93,000 \u00a0\u00a0<\/td>\n<td>$<\/td>\n<td>1,484,000 \u00a0\u00a0<\/td>\n<\/tr>\n<tr>\n<td colspan=\"9\">\n<hr\/>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0<\/p>\n<table width=\"620\">\n<tbody>\n<tr>\n<td width=\"3%\">a.<\/td>\n<td width=\"97%\">\n<p>Compute the underapplied or overapplied overhead for the year, assuming that a plantwide overhead rate is used. <span><strong>(Round your intermediate calculations to the nearest percent.)<\/strong><\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td width=\"3%\">\u00a0<\/td>\n<td width=\"97%\">\u00a0<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0<a rel=\"nofollow noopener\" target=\"_blank\" style=\"display: none;\"> <\/p>\n<table width=\"620\">\n<tbody>\n<tr>\n<td width=\"3%\">b.<\/td>\n<td width=\"98%\">\n<p>Compute the underapplied or overapplied overhead for the year, assuming that departmental overhead rates are used. <span><strong>(Enter all overapplied values as negative numbers. Round your intermediate calculations to the nearest percent.)<\/strong><\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td width=\"3%\">\u00a0<\/td>\n<td width=\"98%\">\u00a0<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0<a rel=\"nofollow noopener\" target=\"_blank\" style=\"display: none;\"><\/p>\n<div>\n<div>\n<p>References<\/p>\n<p>eBook &amp; Resources<\/p>\n<div>\n<p><span>Worksheet<\/span><span>Learning Objective: 04-01 Compute a predetermined overhead rate.<\/span><span>Learning Objective: 04-03 Compute the total cost and average cost per unit of a job<\/span><\/p>\n<p><span>Difficulty: Hard<\/span><span>Learning Objective: 04-02 Apply overhead cost to jobs using a predetermined overhead rate.<\/span><span>Learning Objective: 04-04 Compute underapplied or overapplied overhead cost.<\/span><\/p>\n<\/div>\n<\/div>\n<p><a rel=\"nofollow noopener\" target=\"_blank\" class=\"aid_link noPrint\" href=\"https:\/\/www.sweetstudy.com\/content\/javascript:askInstructor(\" plantwide=\"\" versus=\"\" departmental=\"\" overhead=\"\" rates=\"\" underapplied=\"\" or=\"\" overapplied=\"\" lo4-2=\"\" lo4-3=\"\" lo4-4=\"\"><span><span>Ask your instructor a question<\/span><\/span><span><span>Check my work<\/span><\/span><\/div>\n<p>\u00a0<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>&#8220;Don&#8217;t tell me we&#8217;ve lost another bid!&#8221; exclaimed Sandy Kovallas, president of Lenko Products, Inc. &#8220;I&#8217;m afraid so,&#8221; replied Doug Martin, the operations vice president. &#8220;One of our competitors underbid us by about $10,200 on the Hastings job.&#8221; &#8220;I just can\u2019t figure it out,&#8221; said Kovallas. &#8220;It seems we\u2019re either too high to get the [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[16],"tags":[],"class_list":["post-47992","post","type-post","status-publish","format-standard","hentry","category-education"],"_links":{"self":[{"href":"https:\/\/assignmenttutors.net\/blog\/wp-json\/wp\/v2\/posts\/47992","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/assignmenttutors.net\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/assignmenttutors.net\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/assignmenttutors.net\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/assignmenttutors.net\/blog\/wp-json\/wp\/v2\/comments?post=47992"}],"version-history":[{"count":0,"href":"https:\/\/assignmenttutors.net\/blog\/wp-json\/wp\/v2\/posts\/47992\/revisions"}],"wp:attachment":[{"href":"https:\/\/assignmenttutors.net\/blog\/wp-json\/wp\/v2\/media?parent=47992"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/assignmenttutors.net\/blog\/wp-json\/wp\/v2\/categories?post=47992"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/assignmenttutors.net\/blog\/wp-json\/wp\/v2\/tags?post=47992"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}