{"id":43789,"date":"2022-03-21T05:57:54","date_gmt":"2022-03-21T05:57:54","guid":{"rendered":"https:\/\/assignmenttutors.net\/blog\/answer-the-following-questions-based-on-attached-files\/"},"modified":"2022-03-21T05:57:54","modified_gmt":"2022-03-21T05:57:54","slug":"answer-the-following-questions-based-on-attached-files","status":"publish","type":"post","link":"https:\/\/assignmenttutors.net\/blog\/answer-the-following-questions-based-on-attached-files\/","title":{"rendered":"Answer the following questions based on attached files"},"content":{"rendered":"<div>\n<p>\u00a0<\/p>\n<p>\u00a0The homework questions also attached in the word file(HW.docx) named HW.\u00a0<\/p>\n<p><u><em><strong>Answer the following questions BASED on ATTACHED files\u00a0<\/strong><\/em><\/u><\/p>\n<p>1-You are reviewing proposals submitted for the \u201cLambert Park Phase 2\u201d project. Using the RFP evaluate 2 of the 4 proposals and score them on the evaluation sheet provided (separate excel file, ignore cost for this assignment).<\/p>\n<p><strong>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 \u00a0\u00a0\u00a0\u00a0Company#1<\/strong> \u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0Company#2<\/p>\n<p>Criteria \u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 <u><em>max<\/em><\/u> \u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0<strong>score \u00a0\u00a0\u00a0\u00a0commets<\/strong> \u00a0\u00a0\u00a0\u00a0\u00a0score \u00a0\u00a0\u00a0\u00a0commets<\/p>\n<p><em>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0points \u00a0\u00a0\u00a0\u00a0<\/em>\u00a0\u00a0<strong>Co#1 \u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0Co#1<\/strong> \u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0Co#2 \u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0Co#2\u00a0<\/p>\n<p>Expertise, Experience &amp; Training \u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0<u>25<\/u><\/p>\n<p>Plus Prior Contracting History(25%)\u00a0<\/p>\n<p>The expertise, experience and\u00a0<\/p>\n<p>training of the proposer and its key<\/p>\n<p>\u00a0personnel and previous experience\u00a0<\/p>\n<p>with similar work in similar fields and<\/p>\n<p>\u00a0qualifications and depth of the staff\u00a0<\/p>\n<p>that will performthe work on this \u00a0\u00a0<\/p>\n<p>project. \u00a0This factor includes evaluation<\/p>\n<p>of the proposer\u2019s prior contracting history<\/p>\n<p>, including the review of the proposer\u2019s\u00a0<\/p>\n<p>certifications relating to false claims,<\/p>\n<p>debarment and civil litigation.<\/p>\n<p>\u00a0Project Approach (40%) \u2013 The \u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0<u>40<\/u><\/p>\n<p>proposer\u2019s responsiveness in developing<\/p>\n<p>\u00a0a comprehensive plan while meeting\u00a0<\/p>\n<p>regulatory requirements and\u00a0<\/p>\n<p>the City\u2019s specific needs\u00a0<\/p>\n<p>Schedule (10%) \u2013 Proposal for \u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0<u>10<\/u><\/p>\n<p>completing the project in a timely<\/p>\n<p>manner, inclusive of the proposer\u2019s<\/p>\n<p>ability to identify critical paths for\u00a0<\/p>\n<p>the timely and competent completion<\/p>\n<p>of all work contemplated under the RFP.\u00a0<\/p>\n<p>Compliance with RFP (10%) \u2013 The ability of \u00a0\u00a0\u00a0\u00a0\u00a0<u>10<\/u><\/p>\n<p>the proposer to comply with all instructions<\/p>\n<p>set forth under this RFP as well as the proposer\u2019s<\/p>\n<p>\u00a0ability to agree to all of the terms and conditions<\/p>\n<p>\u00a0of the attached PSA without modification,<\/p>\n<p>\u00a0particularly as relates to indemnification,\u00a0<\/p>\n<p>insurance requirements and standards of care.\u00a0<\/p>\n<p>Cost (15%) \u2013 The proposed compensation \u00a0\u00a0\u00a0\u00a0\u00a0\u00a0<u>15<\/u><\/p>\n<p>structure (inclusive of \u00a0\u00a0hourly rates of\u00a0<\/p>\n<p>compensation, pass through costs and\u00a0<\/p>\n<p>subconsultant costs) for \u00a0\u00a0the performance of<\/p>\n<p>\u00a0Tasks 1 through 8, inclusive of its proposed not-to<\/p>\n<p>\u00a0-exceed sum. \u00a0The proposers proposed strategy for<\/p>\n<p>\u00a0containing costs \u00a0\u00a0incurred by City while still meeting<\/p>\n<p>\u00a0the objectives and standards set forth \u00a0\u00a0under the RFP.<\/p>\n<p>2. Risk Management Case Study &#8211; ANMC<\/p>\n<p><strong>Part A: <\/strong>Evaluate the risks associated with completing this project by using a risk matrix. Identify at least 6 important threats, define your probability and cost scales, evaluate the risks and list the threats in order from highest to lowest risk.<\/p>\n<p><strong>Part B: <\/strong>Of the risks you identified, which risks should you mitigate? What steps could you take to manage and\/or mitigate the risks you identified\u00a0<\/p>\n<p><em>Risk Analysis &amp; Risk Management: Evaluating and Managing the Risks You Face<\/em>,\u00a0<a rel=\"nofollow noopener\" target=\"_blank\" href=\"http:\/\/www.mindtools.com\/pages\/article\/newTMC_07.htm\"><u>http:\/\/www.mindtools.com\/pages\/article\/newTMC_07.htm<\/u><\/a>\u00a0<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>\u00a0 \u00a0The homework questions also attached in the word file(HW.docx) named HW.\u00a0 Answer the following questions BASED on ATTACHED files\u00a0 1-You are reviewing proposals submitted for the \u201cLambert Park Phase 2\u201d project. Using the RFP evaluate 2 of the 4 proposals and score them on the evaluation sheet provided (separate excel file, ignore cost for [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[16],"tags":[],"class_list":["post-43789","post","type-post","status-publish","format-standard","hentry","category-education"],"_links":{"self":[{"href":"https:\/\/assignmenttutors.net\/blog\/wp-json\/wp\/v2\/posts\/43789","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/assignmenttutors.net\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/assignmenttutors.net\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/assignmenttutors.net\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/assignmenttutors.net\/blog\/wp-json\/wp\/v2\/comments?post=43789"}],"version-history":[{"count":0,"href":"https:\/\/assignmenttutors.net\/blog\/wp-json\/wp\/v2\/posts\/43789\/revisions"}],"wp:attachment":[{"href":"https:\/\/assignmenttutors.net\/blog\/wp-json\/wp\/v2\/media?parent=43789"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/assignmenttutors.net\/blog\/wp-json\/wp\/v2\/categories?post=43789"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/assignmenttutors.net\/blog\/wp-json\/wp\/v2\/tags?post=43789"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}