{"id":32798,"date":"2022-02-14T10:45:31","date_gmt":"2022-02-14T10:45:31","guid":{"rendered":"https:\/\/assignmenttutors.net\/blog\/how-to-work-on-spreadsheet-document-using-the-information-given\/"},"modified":"2022-02-14T10:45:31","modified_gmt":"2022-02-14T10:45:31","slug":"how-to-work-on-spreadsheet-document-using-the-information-given","status":"publish","type":"post","link":"https:\/\/assignmenttutors.net\/blog\/how-to-work-on-spreadsheet-document-using-the-information-given\/","title":{"rendered":"How to work on spreadsheet document using the information given"},"content":{"rendered":"<div>\n<p>\u00a0<\/p>\n<h2><strong>Independent Project 3-4<\/strong><\/h2>\n<p>Windows \u00a0\u00a0Mac<\/p>\n<p>For this project, you create a column chart to illustrate April\u2013September revenue for Classic Gardens and Landscapes. You also build a pie chart sheet to graph the proportion that each category contributes to total revenue.<\/p>\n<p><strong>[Student Learning Outcomes 3.1, 3.2, 3.3, 3.4, 3.5, 3.6]<\/strong><\/p>\n<p>File Needed: <em><strong>ClassicGardens-03.xlsx<\/strong><\/em> <em>(Available from the<\/em> Start File <em>link.)<\/em><\/p>\n<p>Completed Project File Name: <em><strong>[your name]-ClassicGardens-03.xlsx<\/strong><\/em><\/p>\n<h3><em><strong>Skills Covered in This Project<\/strong><\/em><\/h3>\n<ul>\n<li>Create a chart object.<\/li>\n<li>Size and position a chart object.<\/li>\n<li>Edit and format chart elements.<\/li>\n<li>Edit the source data for a chart.<\/li>\n<li>Build a pie chart sheet.<\/li>\n<li>Use texture as fill.<\/li>\n<li>Add and format data labels in a chart.<\/li>\n<\/ul>\n<p><img loading=\"lazy\" decoding=\"async\" alt=\"Alternate Instruction for Microsoft 365 Apps icon\" height=\"27\" src=\"https:\/\/bronxcc.simnetonline.com\/content\/assets\/InPractice2019\/ex19_ip\/assets\/images\/icon_alternate_wide.png\" width=\"102\"\/> This image appears when a project instruction has changed to accommodate an update to <strong>Microsoft 365 Apps<\/strong>. If the instruction does not match your version of Office, try using the alternate instruction instead.<\/p>\n<ol>\n<li>Open the <em><strong>ClassicGardens-03<\/strong><\/em><strong>.xlsx<\/strong> start file. If the workbook opens in <em>Protected View<\/em>, click the <strong>Enable Editing<\/strong> button so you can modify it. The file will be renamed automatically to include your name. Change the project file name if directed to do so by your instructor, and save it.<\/li>\n<li>Create a <strong>Clustered Column<\/strong> chart object for cells <strong>A4:G9<\/strong>.<\/li>\n<li>Move the chart object so that its top-left corner is at cell <strong>A12<\/strong>. Size the bottom of the chart to reach cell <strong>H30<\/strong>.<\/li>\n<li>Edit the chart title to display CGL Major Sales Revenue and press <strong>Enter<\/strong> to start a new line. On the second line, type Second and Third Quarters.<\/li>\n<li>Apply chart <strong>Style 14<\/strong> to the chart.<\/li>\n<li>Format the first line and the second line of the chart title to a font size of <strong>20 pt<\/strong>.<\/li>\n<li>Apply a <strong>1 pt<\/strong> <strong>Black, Text 1<\/strong> (second column) outline to the chart area.<\/li>\n<li>Verify that the chart is still selected. In the highlighted range in the worksheet, drag the resize pointer to remove the <em>Design Consulting<\/em> data series from the chart (Figure 3-71).<img loading=\"lazy\" decoding=\"async\" alt=\"Resize the chart by dragging the resize pointer\" src=\"https:\/\/bronxcc.simnetonline.com\/content\/assets\/InPractice2019\/ex19_ip\/assets\/images\/EX_fig3-71.png\" width=\"382\" height=\"321\"\/><strong>Figure 3-71 Resize the chart by dragging the resize pointer<\/strong><\/li>\n<li>Create a <em>3-D Pie<\/em> chart sheet for cells <strong>A4:A9<\/strong> and cells <strong>H4:H9<\/strong>. Move the chart to its own sheet named Revenue Breakdown. <strong>Hint:<\/strong> Use the <strong>Move Chart<\/strong> button [<em>Chart Design<\/em> tab, <em>Location<\/em> group].<br \/><img loading=\"lazy\" decoding=\"async\" alt=\"Alternate Instruction for Microsoft 365 Apps icon\" height=\"27\" src=\"https:\/\/bronxcc.simnetonline.com\/content\/assets\/InPractice2019\/ex19_ip\/assets\/images\/icon_alternate_wide.png\" width=\"102\"\/> Create a <em>3-D Pie<\/em> chart sheet for cells <strong>A4:A9<\/strong> and cells <strong>H4:H9<\/strong>. Move the chart to its own sheet named Revenue Breakdown. <strong>Hint:<\/strong> Use the <strong>Move Chart<\/strong> button [<em>Chart Tools Design<\/em> tab, <em>Location<\/em> group].<\/li>\n<li>Edit the chart title to display Revenue by Category. Change the font size to <strong>32<\/strong>.<\/li>\n<li>Select the legend and change the font size to <strong>12<\/strong>.<\/li>\n<li>Apply the <strong>Woven mat<\/strong> texture fill (first row, fourth column) to the <em>Patio and Furniture<\/em> slice.<\/li>\n<li>Select the pie shape and add data labels to display in the center of each slice.\n<ol>\n<li>Display the <em>Format Data Labels<\/em> task pane, choose the <strong>Accounting<\/strong> format [<em>Label<\/em> <em>Options<\/em> button, <em>Number<\/em> group], and set <strong>0<\/strong> decimal places.<\/li>\n<li>Change the data label font size to <strong>14<\/strong> <strong>pt<\/strong> and apply <strong>bold<\/strong> [<em>Home<\/em> tab, <em>Font<\/em> group].<\/li>\n<\/ol>\n<\/li>\n<li>Deselect the chart.<\/li>\n<li>Save and close the workbook (Figure 3-72).<img loading=\"lazy\" decoding=\"async\" alt=\"Excel 3-4 completed worksheet and chart\" src=\"https:\/\/bronxcc.simnetonline.com\/content\/assets\/InPractice2019\/ex19_ip\/assets\/images\/EX_fig3-72.png\" width=\"745\" height=\"316\"\/><strong>Figure 3-72 Excel 3-4 completed worksheet and chart<\/strong><\/li>\n<li>Upload and save your project file.<\/li>\n<li>Submit project for grading.<\/li>\n<\/ol>\n<p>Reset Progress Back to top<\/p>\n<h2>SUPPORT<\/h2>\n<h2>FOLLOW MCGRAW HILL<\/h2>\n<p><a rel=\"nofollow noopener\" target=\"_blank\" href=\"http:\/\/www.simnetcommunity.com\/\"><u>SIMnet Blog<\/u><\/a><\/p>\n<p>\u00a9 2021 McGraw-Hill Education. All rights reserved.<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>\u00a0 Independent Project 3-4 Windows \u00a0\u00a0Mac For this project, you create a column chart to illustrate April\u2013September revenue for Classic Gardens and Landscapes. You also build a pie chart sheet to graph the proportion that each category contributes to total revenue. [Student Learning Outcomes 3.1, 3.2, 3.3, 3.4, 3.5, 3.6] File Needed: ClassicGardens-03.xlsx (Available from [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[16],"tags":[],"class_list":["post-32798","post","type-post","status-publish","format-standard","hentry","category-education"],"_links":{"self":[{"href":"https:\/\/assignmenttutors.net\/blog\/wp-json\/wp\/v2\/posts\/32798","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/assignmenttutors.net\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/assignmenttutors.net\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/assignmenttutors.net\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/assignmenttutors.net\/blog\/wp-json\/wp\/v2\/comments?post=32798"}],"version-history":[{"count":0,"href":"https:\/\/assignmenttutors.net\/blog\/wp-json\/wp\/v2\/posts\/32798\/revisions"}],"wp:attachment":[{"href":"https:\/\/assignmenttutors.net\/blog\/wp-json\/wp\/v2\/media?parent=32798"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/assignmenttutors.net\/blog\/wp-json\/wp\/v2\/categories?post=32798"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/assignmenttutors.net\/blog\/wp-json\/wp\/v2\/tags?post=32798"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}