{"id":23799,"date":"2022-01-09T23:02:56","date_gmt":"2022-01-09T23:02:56","guid":{"rendered":"https:\/\/assignmenttutors.net\/blog\/mgt-3121-final-exam-business-finance-homework-help\/"},"modified":"2022-01-09T23:02:56","modified_gmt":"2022-01-09T23:02:56","slug":"mgt-3121-final-exam-business-finance-homework-help","status":"publish","type":"post","link":"https:\/\/assignmenttutors.net\/blog\/mgt-3121-final-exam-business-finance-homework-help\/","title":{"rendered":"Mgt-3121-final exam | Business &#038; Finance homework help"},"content":{"rendered":"<div>\n<p><span>1.<span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>The basic purpose of supply chain management is to<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 create an exclusive set of suppliers who will not supply your competitors. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 link your customers together so that the flow of materials remains under control. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c. synchronize the operations of all suppliers with those of purchasing, production, distribution, and customers. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 reduce the inventory by proper selection of customers and transportation modes. <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>2.<span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Which one of the following is TRUE for supply chain management? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Supply-chain concept applies to both manufacturing and service organizations. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Supply chain applies only to manufacturing because it deals with flow of materials. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Supply chain is about suppliers and does not include distributors or customers. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Supply chain includes any operation that deals with materials. <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>3.<span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>For improving the efficiency and productivity of a complex supply chain, a company should do which of the following? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Never adopt backward vertical integration. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Enter into agreements with first-tier suppliers, and let them manage their suppliers. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Adopt backward vertical integration or enter into agreements with first-tier suppliers. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Adopt backward vertical integration, but avoid writing agreements with first-tier suppliers. <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>4.<span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Which one of the following statements is TRUE about purchasing? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Purchasing must satisfy the firm\u2019s long-term supply needs. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Purchasing\u2019s primary role should be placing and tracking orders. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Purchasing\u2019s primary role is to negotiate lower prices. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Purchasing\u2019s primary role is to negotiate prices and delivery dates. <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>5.<span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Which one of the following statements regarding supplier selection criteria is TRUE? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Supplier should be selected on the basis of price only because the cost of materials is a significant portion of total product cost. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Supplier should be selected on the basis of quality, price, and delivery. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Supplier should be selected primarily on the basis of the shortest lead time because higher lead time increases the cost of inventory. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Supplier should be selected on the basis of quality because quality is always the most important characteristic of a product. <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>6.<span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Which one of the following statements is TRUE about a cooperative orientation in supplier relationships? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 It cannot be implemented in Western countries because competitive bidding is more effective in that culture.\u00a0 <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 It cannot be implemented in the Western countries because it always benefits the supplier. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 It requires all parts and subassemblies to be purchased from the same supplier. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 It requires few suppliers for each item or service. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d(Managing the Supplier Interface, moderate)<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>7.<span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>One of the benefits of a cooperative orientation in supplier relationships is <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 the buyer sometimes suggests ways to improve the supplier\u2019s operations. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 the supplier implements its own quality standards. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 the buyer does not have to share much information with the supplier. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 the supplier has complete freedom in choosing the delivery time. <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>8.<span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Which one of the following statements is TRUE about a competitive orientation in supplier relationships? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 It tends to emphasize short-term advantages over long-term commitments. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 The supplier gains repeatability and can move toward a line flow process. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 The supplier is obliged to offer the lowest possible price every time. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 The supplier is obliged to deliver the material in the shortest possible time, every time. <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>9.<span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Which one of the following statements is TRUE? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 A buying firm should always adopt a competitive orientation for a standard item with high demand. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Single sourcing is always desirable for high demand items. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Long-term contracts are consistent with a cooperative orientation to supplier relationships. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 The buyer always wins in a competitive orientation to supplier relationships. <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>10.<span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Which one of the following statements correctly represents a benefit of centralized buying? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Local managers have more control over their business. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Purchases and production schedules are meshed more easily. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Purchasing lead times may be shorter. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Increased buying power can result in significant savings in purchasing costs. <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>11.<span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Which one of the following statements on inventory placement of finished goods is best? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Forward placement might help reduce transportation cost. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Forward placement is consistent with a competitive priority that calls for customization. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Inventory pooling should be avoided when demand in various regions fluctuates month to month. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Backward placement is consistent with a competitive priority that calls for fast delivery times. <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>12.<span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Some manufacturers and service providers want to measure the performance of supply chain by the percentage of on-time deliveries. The main reason for this measure is <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 it will discourage the competitors to enter the market. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 it measures the satisfaction levels of suppliers. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 increased on-time delivery increases revenue by inducing customers to buy more products from the firm. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 It helps accounting to debit customer\u2019s accounts promptly. <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>13.<span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Which one of the following statements about the relation between financial and supply chain performance measures is TRUE? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Longer delivery times require higher levels of working capital. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Shorter new product development time decreases revenue. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Higher inventory turns call for higher working capital requirement. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Lower aggregate inventory value means higher current assets. <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>14.<span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Efficient supply chain should be preferred when <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 product variety is high.<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 competitive priority is customization. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 demand is highly predictable.<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 demand is unpredictable. <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>15.<span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>The type of goods for which efficient supply chain is appropriate is <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 high product cost.<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 frequent design changes. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 high contribution margin.<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 standardized products. <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>16.<span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Responsive supply chains should be preferred when <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 product variety is low. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 demand is predictable. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 contribution margins are low. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 product variety is high. <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>17.<span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>The type of goods for which a responsive supply chain is appropriate are <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 fashion goods.<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 products with a long shelf life. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 expensive products.<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 those with infrequent design changes. <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>18.<span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>A firm in the higher echelon of an efficient supply chain is likely to have <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 high-capacity utilization.<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 low inventory turns. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 high-capacity cushions.<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 a flexible flow process. <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>19.<span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>It is desirable for a firm in the higher echelon of an efficient supply chain to have <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 high-capacity cushions.<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 delivery by air. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 a line flow process.<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 high inventory investment. <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>20.<span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>It is recommended that a firm in the higher echelon of an efficient supply chain have <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 delivery by air.<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 high-capacity cushions. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 low inventory investments. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 low-capacity utilization. <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>21.<span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Firms in a responsive supply chain are expected to have <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 long delivery times.<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 high inventory investments. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 flexible flow process.<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 low-capacity cushions. <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>22.<span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>It is desirable for a firm in a responsive supply chain to have <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 low-capacity cushions. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 delivery by railroad. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 high-capacity utilization consistent with high-volume delivery. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 low inventory investments consistent with fast delivery times. <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>23.<span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>It is recommended that a firm in a responsive supply chain should have <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 volume flexibility.<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 flexible quality policy. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 standardized product.<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 low-capacity cushion. <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>24.<span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>The objective of a firm in a responsive supply chain is likely to be realized if it has a<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 standardized product.<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 short lead time. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 low-capacity cushion.<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 line flow process. <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>25.<span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>One source of disruption caused by the internal supply chain is <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 forecast error.<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 underfilled shipments. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 volume changes.<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 late deliveries. <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>26.<span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>One source of disruption caused by the external supply chain is <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 product or sales promotions. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 new product or service introduction. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 late deliveries. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 engineering changes. <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>27.<span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Possible causes of disruption due to internal supply chain are <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 late deliveries. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 machine breakdowns or inexperienced workers. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 product and service mix changes. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 underfilled shipments. <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>28.<span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Last year, CMS Enterprises had total inventories (raw materials, work-in-process, and finished goods) of $5.5 million. During this same year the cost of goods sold was $22 million. The company operates 52 weeks per year. What is the total inventory (measured as weeks of supply) held by CMS Enterprises last year? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Less than or equal to 10 weeks of supply <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Greater than 10 but less than or equal to 12 weeks of supply <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Greater than 12 but less than or equal to 14 weeks of supply <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Greater than 14 weeks of supply <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>29.<span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Henderson Corporation is a supplier of alloy ball bearings to auto manufacturers in Detroit. Because of the specialized manufacturing process employed, considerable work-in-process and raw material inventories are created. The current inventory levels are $1,152,000 and $2,725,000, respectively. In addition, finished goods inventory is $3,225,000, and sales (at cost) for the current year are expected to be about $24 million. The inventory turnover that Henderson Corporation is currently expecting is <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 less than 2.0.<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 greater than 2.0 but less than 2.5. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 greater than 2.5 but less than 3.0.<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 greater than 3.0. <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>30.<span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Maple Leaf, Inc., a television manufacturer, would like to reduce its inventory. To this end, you are asked by the operations manager to assess its inventory level. You have the following information on inventories from last year\u2019s financial statement:<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Raw materials \u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 $2,500,000<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Work-in-process\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 \u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 $1,000,000<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Finished goods\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 $\u00a0 800,000<\/span><\/p>\n<p><span>In addition, the cost of goods sold last year (50 weeks) was $15 million. What was the inventory turnover? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Less than or equal to 2<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Greater than 2 but less than 3 <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Greater than 3 but less than 4<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Greater than 4 <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>31.<span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>The average inventory at Hamilton Industries, comprising raw materials, work-in-process, and finished goods, was found to be $17.2 million last year. If the cost of goods sold per week averaged $1.32 million, what was the inventory turnover experienced by Hamilton Industries? Assume the company had 50 working weeks per year. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Less than or equal to 3.50<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Greater than 3.50 but less than 3.75 <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Greater than 3.75 but less than 4.00<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Greater than 4.00 <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>32.<span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Marvin Johnson, Jr., materials manager at Johnson &amp; Sons, has determined that a certain product experienced 3.8 turns last year. Johnson &amp; Sons operates 52 weeks a year, and its annual sales volume (at cost) was $975,000. What was the average inventory value for this product last year? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Less than or equal to $150,000 <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Greater than $150,00 but less than or equal to $300,000 <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Greater than $300,00 but less than or equal to $450,000 <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Greater than $450,000 <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>33.<span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Which one of the following basic patterns of demand is difficult to predict because it is affected by national or international events or because of a lack of demand history reflecting the stages of demand from product development to decline? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Horizontal<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Seasonal<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Random<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Cyclical <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>34.<span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Which one of the following statements about the patterns of a demand series is FALSE? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 The five basic patterns of most business demand series are the horizontal, trend, seasonal, cyclical, and random. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Estimating cyclical movement is difficult. Forecasters do not know the duration of the cycle because they cannot predict the events that cause it. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 The trend, over an extended period of time, always increases the average level of the series. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Every demand series has at least the following two components: horizontal and random. <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>35.<span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Which one of the following is a leading indicator for the general business cycle? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Residential building contracts<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Retail sales <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Unemployment figures<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Bank rates on business loans <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>36.<span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Which one of the following is a coincident indicator for the general business cycle? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Residential building contracts<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Retail sales <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Unemployment figures<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Bank rates on business loans <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>37.<span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Which one of the following indicators is a lagging indicator of the general business cycle? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Residential building contracts<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Retail sales <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Unemployment figures<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Price changes of a major competitor <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>38.<span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Which one of the following statements about demand indicators is TRUE? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Leading indicators are time series with turning points that generally match those of the general business cycle. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Coincident indicators are time series with turning points that typically precede the peaks and troughs of the general business cycle. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Lagging indicators follow the turning points, typically by several weeks or months. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Demand indicators are time series that are used to predict random errors in a forecast before they occur. <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>39.<span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Which one of the following factors affecting demand for goods and services is an external factor? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Product design<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Consumer tastes <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Price and advertising promotions<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Packaging design <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>40.<span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Which one of the following factors affecting demand for goods and services is an external factor? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Salesperson quotas or incentives <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Expansion or contraction of geographical market target areas <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Government actions <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Product mix <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>41.<span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>An example of an external factor affecting the demand for goods or services is <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 product mix changes. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 the company\u2019s price and advertising promotions. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 backlog policy. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 competitor pricing actions. <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>42.<span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Which one of the following factors affecting demand for goods and services is an internal factor? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Backlog policy<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 General state of the economy <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Competitor actions<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Consumer tastes <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>43.<span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Which one of the following factors affecting demand is an internal factor? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Public image of the product <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 competitor actions <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Availability and cost of complementary products <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Expansion or contraction of geographical market target areas. <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>44.<span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Which one of the following statements about forecasting is FALSE? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 To achieve the objective of developing a useful forecast from the information at hand, the forecaster must select the appropriate technique. This choice sometimes involves a trade-off between forecast accuracy and cost. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Three general types of forecasting techniques are used for demand forecasting: time-series analysis, causal methods, and judgment methods. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Time series express the relationship between the factor to be forecast and related factors, such as promotional campaigns, economic conditions, and competitor actions. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 A time series is a list of repeated observations of a phenomenon, such as demand, arranged in the order in which they actually occurred. <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>45.<span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Which one of the following statements about forecasting is TRUE? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 The five basic patterns of demand are the horizontal, trend, seasonal, cyclical, and the subjective judgment of forecasters. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Judgment methods are designed particularly for situations when historical data are lacking. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Casual methods are used when historical data are available and the relationship between the factor to be forecast and other external and internal factors cannot be identified.\u00a0 <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Focused forecasting is a technique that focuses on one particular component of demand and develops a forecast from it. <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>46.<span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Which one of the following statements is FALSE? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Managers are typically interested in forecasts of unit demand for individual products for the short term. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Causal models are the methods most often used for short-term forecasting. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 In the short term, operations managers rarely can wait for the development of causal models, even though these models may be more accurate than time-series models. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Managers use judgment methods for short-term forecasts when historical data are not available for a specific term. <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>47.<span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Which one of the following statements about forecasting is FALSE? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 In the short term (here, 0\u20133 months in the future), managers are typically interested in forecasts of total sales and groups (or families) of products. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Time-series analysis is the method most often used for short-term forecasting. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 The need for medium-term forecasts arises from planning problems related to issues of capacity. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Determining turning points is very important for the operations manager, particularly in the medium and long term. <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>48.<span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Which one of the following statements about forecasting is TRUE? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Determining turning points, which are periods when the growth rate of demand will change, can best be accomplished with time-series methods. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 In the short-term (here, 1\u20133 months in the future), managers are typically interested in forecasts of total sales and groups or families of products. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Causal models are the methods most often used for short-term forecasting. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 For time horizons exceeding two years, forecasts are usually developed for total sales demand in dollars or some other common unit of measurement, such as barrels, pounds, or kilowatts. <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>49.<span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Using sales force estimates for forecasting has the advantage that <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 no biases exist in the forecasts. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 statistical estimates of seasonal factors are more precise than any other approach. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 forecasts of individual sale force members can be easily combined to get regional or national sales totals. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 confusion between customer \u201cwants\u201d (wish list) and customer \u201cneeds\u201d (necessary purchases) is eliminated. <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>50.<span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Which one of the following is an example of a time-series forecasting technique? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Survey analysis <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Delphi method <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Trend-adjusted exponential smoothing <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Market research <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>51.<span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>The judgment methods of forecasting are to be used for purposes of <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 making adjustments to quantitative forecasts due to unusual circumstances. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 forecasting seasonal demands in lieu of time-series approaches. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 avoiding the calculations necessary for quantitative forecasts. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 making forecasts more variable. <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>52.<span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>The Delphi method of forecasting is useful when <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 judgment and opinion are the only bases for making informed projections. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 a systematic approach to creating and testing hypotheses is needed and the data are usually gathered by sending a questionnaire to consumers. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 historical data are available and the relationship between the factor to be forecast and other external or internal factors can be identified. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 historical data is available and the best basis for making projections is to use past demand patterns. <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>53.<span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Which one of the following statements about forecasting is FALSE? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 You should use the simple moving average method to estimate the mean demand of a time series that has a pronounced trend and seasonal influences. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 The weighted moving average method allows forecasters to emphasize recent demand over earlier demand. The forecast will be more responsive to change in the underlying average of the demand series. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 The most frequently used time-series forecasting method is exponential smoothing because of its simplicity and the small amount of data needed to support it. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 In exponential smoothing, higher values place greater weight on recent demands in computing the average. <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>54.<span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>When the underlying mean of a time series changes frequently but there is no trend, cyclical, or seasonal influence, <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 a simple moving average forecast with <em>n<\/em> = 20 should outperform a simple moving average forecast with <em>n<\/em> = 3. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 a simple moving average forecast with <em>n<\/em> = 3 should outperform a simple moving average forecast with <em>n<\/em> = 20. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 a simple moving average forecast with <em>n<\/em> = 20 should perform about the same as a simple moving average forecast with <em>n<\/em> = 3. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 an exponential smoothing forecast with <em>a<\/em> = 0.01 should outperform a simple moving average forecast with <em>a<\/em> = 0.30. <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>55.<span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>When the underlying mean of a time series is very stable and there are no trend, cyclical, or seasonal influences, <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 a simple moving average forecast with <em>n<\/em> = 20 should outperform a simple moving average forecast with <em>n<\/em> = 3. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 a simple moving average forecast with <em>n<\/em> = 3 should outperform a simple moving average forecast with <em>n<\/em> = 20. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 a simple moving average forecast with <em>n<\/em> = 20 should perform about the same as a simple moving average forecast with <em>n<\/em> = 3. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 an exponential smoothing forecast with <em>a<\/em> = 0.30 should outperform a simple moving average forecast with <em>a<\/em> = 0.01. <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>56.<span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>With the trend-adjusted exponential smoothing method, <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 the forecast for the next period is simply the average computed this period. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 an estimate of the trend is computed by taking the difference between the demand this period and the demand last period to avoid lengthy averaging calculations. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 the only smoothing is done on the trend estimates using exponential smoothing. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 the forecast can be adjusted to account for changes in the trend. <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>57.<span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>With the multiplicative seasonal method of forecasting, <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 the times series cannot exhibit a trend. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 seasonal factors are multiplied by an estimate of average demand to arrive at a seasonal forecast. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 the seasonal amplitude is a constant, regardless of the magnitude of average demand. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 there can only be four seasons in the time-series data. <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>58.<span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>The multiplicative seasonal method is most appropriate when <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 the seasonal influence is a constant regardless of the level of demand. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 the seasonal influence is erratic, changing in the timing of the peaks and valleys. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 the seasonal influence is dependent on the level of demand. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 the demand each period is a constant multiple of the demand in the previous period. <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>59.<span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Which one of the following statements about forecasting is FALSE? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 The method for incorporating a trend in an exponentially smoothed forecast requires the estimation of three smoothing constants: one for the mean, one for the trend, and one for the error. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 The cumulative sum of forecast errors (CFE) is useful in measuring the bias in a forecast. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 The standard deviation and the mean absolute deviation measure the dispersion of forecast errors. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 A tracking signal is a measure that indicates whether a method of forecasting has any built-in biases over a period of time. <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>60.<span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Which one of the following is most useful for measuring the bias in a forecast? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Cumulative sum of forecast errors <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Standard deviation of forecast errors <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Mean absolute deviation of forecast errors <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Percentage forecast error in period t <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>61.<span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Which one of the following time-series forecasting methods will generate the most accurate forecasts when demands have a consistent trend pattern? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Simple moving average method <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Weighted moving average method <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Exponential smoothing method <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Trend-adjusted exponential smoothing method <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>62.<span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>A tracking signal greater than zero and a mean absolute deviation greater than zero imply that the forecast has <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 no bias and no variability of forecast error. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 a nonzero amount of bias and a nonzero amount of forecast error variability. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 no bias and a nonzero amount of forecast error variability. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 a nonzero amount of bias and no variability of forecast error. <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>63.<span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Assume that a time-series forecast is generated for future demand, and subsequently it is observed that the forecast method did not accurately predict the actual demand. Specifically, the forecast errors were found to be:<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Mean absolute percent error= 10%<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Cumulative sum of forecast errors\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 = 0%<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Which one of the statements concerning this forecast is TRUE? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 The forecast has no bias but has a positive standard deviation of errors. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 The forecast has a positive bias and a standard deviation of errors equal to zero. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 The forecast has no bias and has a standard deviation of errors equal to zero. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 The forecast has a positive bias and a positive standard deviation of errors. <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>64.<span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Which one of the following is an example of causal forecasting technique? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Weighted moving average <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Linear regression <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Exponential smoothing<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Delphi method <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>65.<span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Which of the following is an example of a judgmental forecasting technique? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Market research<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Multiplicative seasonal method <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Simple moving average<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Linear regression <\/span><\/p>\n<table align=\"left\">\n<tbody>\n<tr>\n<td width=\"39\">\u00a0<\/td>\n<\/tr>\n<tr>\n<td>\u00a0<\/td>\n<td width=\"590\">\n<table width=\"100%\">\n<tbody>\n<tr>\n<td>\n<div>\n<p><span>Table 12.1<\/span><\/p>\n<table border=\"1\">\n<tbody>\n<tr>\n<td valign=\"top\" width=\"102\">\n<p><span>Month<\/span><\/p>\n<\/td>\n<td valign=\"top\" width=\"102\">\n<p><span>Demand<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\" width=\"102\">\n<p><span>January<\/span><\/p>\n<\/td>\n<td valign=\"top\" width=\"102\">\n<p><span>55<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\" width=\"102\">\n<p><span>February<\/span><\/p>\n<\/td>\n<td valign=\"top\" width=\"102\">\n<p><span>52<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\" width=\"102\">\n<p><span>March<\/span><\/p>\n<\/td>\n<td valign=\"top\" width=\"102\">\n<p><span>57<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\" width=\"102\">\n<p><span>April<\/span><\/p>\n<\/td>\n<td valign=\"top\" width=\"102\">\n<p><span>64<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\" width=\"102\">\n<p><span>May<\/span><\/p>\n<\/td>\n<td valign=\"top\" width=\"102\">\n<p><span>58<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\" width=\"102\">\n<p><span>June<\/span><\/p>\n<\/td>\n<td valign=\"top\" width=\"102\">\n<p><span>54<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\" width=\"102\">\n<p><span>July<\/span><\/p>\n<\/td>\n<td valign=\"top\" width=\"102\">\n<p><span>62<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\" width=\"102\">\n<p><span>August<\/span><\/p>\n<\/td>\n<td valign=\"top\" width=\"102\">\n<p><span>69<\/span><\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><span><span>\u00a0<\/span><\/span><\/p>\n<\/div>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>\u00a0<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p> <span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p>\u00a0<\/p>\n<p><span>66.<span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Use the information in Table 12.1. Your boss has asked you to find a good technique to forecast short-term demand for an important product. You have decided to test the following four techniques against the historical data already given:<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 *Three-month simple moving average<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 *Three-month weighted moving average, with weight of 0.6 for the most recent month, 0.3 for the<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 second-most-recent month, and 0.1 for the third-most-recent month <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 *Three-month weighted moving average, with weights of 0.5 for the most recent month, 0.3 for the<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 second-most-recent month, and 0.2 for the third-most-recent month<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 *Exponential smoothing (<em>a<\/em> = 0.3 and the forecast for March was 55)<\/span><\/p>\n<p><span>Use each of the four techniques to forecast April through August, and then use the five months of forecasts to calculate MAD. Round all forecasts to the nearest whole number (i.e., 57.5 rounds to 58) just before doing your MAD calculations. Which of the four techniques is best in terms of MAD? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Three-month simple moving average <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Three-month weighted moving average (0.6, 0.3, 0.1) <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Three-month weighted moving average (0.5, 0.3, 0.2) <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Exponential smoothing (<em>a<\/em> = 0.3) <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>67.<span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Use the information in Table 12.1. What would be the forecast for September if the exponential smoothing technique were used? (<\/span><span>a<\/span><span> = 0.30 and the forecast for March was 55) <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Less than or equal to 65 <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Greater than 65 but less than or equal to 67 <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Greater than 67 but less than or equal to 69 <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Greater than 69 <\/span><\/p>\n<table align=\"left\">\n<tbody>\n<tr>\n<td width=\"35\">\u00a0<\/td>\n<\/tr>\n<tr>\n<td>\u00a0<\/td>\n<td width=\"592\">\n<table width=\"100%\">\n<tbody>\n<tr>\n<td>\n<div>\n<p>Table 12.2<\/p>\n<p><span>The manager of a pizza shop must forecast weekly demand for special pizzas so that he can order pizza shells weekly. Recent demand has been:<\/span><\/p>\n<p><span><img loading=\"lazy\" decoding=\"async\" src=\"\" alt=\"\" width=\"179\" height=\"178\"\/><\/span><\/p>\n<\/div>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>\u00a0<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p> <span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p>\u00a0<\/p>\n<p><span>68.<span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Use the information from Table 12.2. Using a four-week moving average, what is the forecast for week 7? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Less than or equal to 58 <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Greater than 58 but less than or equal to 60 <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Greater than 60 but less than or equal to 62 <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Greater than 62 <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>69.<span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Use the information from Table 12.2. If a four-week weighted moving average were used, what would be the forecast for week 7? (The weights are 0.77, 0.11, 0.11, and 0.01.) <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Less than or equal to 58 <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Greater than 58 but less than or equal to 59 <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Greater than 59 but less than or equal to 60 <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Greater than 60 <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>70.<span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Demand for a new five-inch color TV during the last six periods has been as follows:<\/span><\/p>\n<p><span><img loading=\"lazy\" decoding=\"async\" src=\"\" alt=\"\" width=\"186\" height=\"178\"\/><\/span><\/p>\n<p><span>What is the forecast for period 7 if the company uses the simple moving average method with <em>n<\/em> = 4? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Less than or equal to 115 <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Greater than 115 but less than or equal to 120 <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Greater than 120 but less than or equal to 125 <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Greater than 125 <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>71.<span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Demands for a newly developed salad bar at the Great Professional restaurant for the first six months of this year are shown following. What is the forecast for July if the weighted moving average method is used? (Use weights of 0.5 for the most recent demand, 0.3, and 0.2.)<\/span><\/p>\n<p><span><img loading=\"lazy\" decoding=\"async\" src=\"\" alt=\"\" width=\"179\" height=\"173\"\/><\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Less than or equal to 432 units <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Greater than 432 units but less than or equal to 442 units <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Greater than 442 units but less than or equal to 452 units <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Greater than 452 <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>72.<span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>It is now near the end of May and you must prepare a forecast for June for a certain product. The forecast for May was 900 units. The actual demand for May was 1000 units. You are using the exponential smoothing method with <\/span><span>a<\/span><span> = 0.20. The forecast for June is <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 less than 925 units. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 greater than or equal to 925 units but less than 950 units. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 greater than or equal to 950 units but less than 1000 units. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 greater than or equal to 1000 units. <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>73.<span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>The owner of the Crossed Connections electronic appliance repair shop is enjoying increasing demand for her services. Total weekly demand, measured in standard labor hours, has been increasing. The owner uses trend-adjusted exponential smoothing to make forecasts for the following week so that she can plan work schedules and staffing levels. She has the following data to prepare her forecast:<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 <em>A<span>t<\/span><\/em><span>\u20131<\/span>\u00a0= 100 hours\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 <\/span><span>a<\/span><span> = 0.30<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 <em>T<span>t<\/span><\/em><span>\u20131 <\/span>=\u00a0 10 hours\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 <\/span><span>b<\/span><span> = 0.10<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 <em>D<span>t<\/span><\/em>= 120 hours<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Assuming she is now at the end of week <em>t<\/em>, what is the forecast for week <em>t<\/em> + 1? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Less than or equal to 114 hours <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Greater than 114 hours but less than or equal to 118 hours <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Greater than 118 hours but less than or equal to 122 hours <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Greater than 122 hours <\/span><\/p>\n<p><span>74.<span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>The Acme Computer Company has recorded sales of one of its products for a six-week period:<\/span><\/p>\n<p><span><img loading=\"lazy\" decoding=\"async\" src=\"\" alt=\"\" width=\"141\" height=\"154\"\/><\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Using the three-week moving average method, forecast sales for week 7. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 20<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 21<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 22<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 23 <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<table align=\"left\">\n<tbody>\n<tr>\n<td width=\"55\">\u00a0<\/td>\n<\/tr>\n<tr>\n<td>\u00a0<\/td>\n<td width=\"573\">\n<table width=\"100%\">\n<tbody>\n<tr>\n<td>\n<div>\n<p>Table 12.3<\/p>\n<p><span><img loading=\"lazy\" decoding=\"async\" src=\"\" alt=\"\" width=\"141\" height=\"144\"\/><\/span><\/p>\n<\/div>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>\u00a0<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p> <span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p>\u00a0<\/p>\n<p><span>75.<span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Use the information in Table 12.3. Compute a three-week moving average forecast for the arrival of medical clinic patients in week 5. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Less than or equal to 382 <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Greater than 382 but less than or equal to 389 <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Greater than 389 but less than or equal to 396 <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Greater than 396 <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>76.<span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Use the information in Table 12.3. If the actual number of patients is 415 in week 5, what is the forecast for week 6 using a three-week moving average forecast? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Less than or equal to 390 <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Greater than 390 but less than or equal to 398 <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Greater than 398 but less than or equal to 406 <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Greater than 406 <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>77.<span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Use the information in Table 12.3. Calculate the exponential smoothing forecast for week 5 using <\/span><span>a<\/span><span> = 0.10 and <em>F<\/em><span>4<\/span>\u00a0= 410. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Less than or equal to 400 <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Greater than 400 but less than or equal to 408 <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Greater than 408 but less than or equal to 416 <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Greater than 416 <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<table align=\"left\">\n<tbody>\n<tr>\n<td width=\"29\">\u00a0<\/td>\n<\/tr>\n<tr>\n<td>\u00a0<\/td>\n<td width=\"589\">\n<table width=\"100%\">\n<tbody>\n<tr>\n<td>\n<div>\n<p>Table 12.4<\/p>\n<p><span><img loading=\"lazy\" decoding=\"async\" src=\"\" alt=\"\" width=\"138\" height=\"142\"\/><\/span><\/p>\n<\/div>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>\u00a0<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p> <span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p>\u00a0<\/p>\n<p><span>78.<span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Use the information in Table 12.4. Use the three-month moving average method to forecast sales for June. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Less than or equal to 20 units <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Greater than 20 but less than or equal to 22 units <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Greater than 22 but less than or equal to 24 units <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Greater than 24 units <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>79.<span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Use the information in Table 12.4. Suppose actual sales in June turn out to be 40 units. Use the three-month moving average method to forecast the sales in July. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Less than or equal to 27 <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Greater than 27 but less than or equal to 29 units <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Greater than 29 but less than or equal to 31 units <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Greater than 31 units <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>80.<span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Use the information in Table 12.4. What is the forecast for July with the two-month moving average method and June sales of 40 units? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Less than or equal to 25 units <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Greater than 25 but less than or equal to 30 units <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Greater than 30 but less than or equal to 35 units <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Greater than 35 units <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>81.<span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Use the information in Table 12.4. The forecasting equation for a three-month weighted moving average is:<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 <em>A<span>t<\/span><\/em>\u00a0= <em>W<\/em><\/span><span>1<\/span><em><span>D<span>t<\/span><\/span><\/em><span>\u00a0+ <em>W<\/em><\/span><span>2<\/span><em><span>D<span>t<\/span><\/span><\/em><span>\u2013<\/span><span>1<\/span><span>\u00a0+ <em>W<\/em><\/span><span>3<\/span><em><span>D<span>t<\/span><\/span><\/em><span>\u2013<\/span><span>2<\/span><\/p>\n<p><span>If the sales for June were 40 units and the weights are <em>W<\/em><\/span><span>1<\/span><span>= 1\/2, <em>W<\/em><\/span><span>2<\/span><span>= 1\/3, and <em>W<\/em><\/span><span>3<\/span><span>\u00a0= 1\/6, what is the forecast for July? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Less than or equal to 30 units <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Greater than 30 but less than or equal to 33 units <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Greater than 33 but less than or equal to 36 units <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Greater than 36 units <\/span><\/p>\n<table align=\"left\">\n<tbody>\n<tr>\n<td width=\"37\">\u00a0<\/td>\n<\/tr>\n<tr>\n<td>\u00a0<\/td>\n<td width=\"591\">\n<table width=\"100%\">\n<tbody>\n<tr>\n<td>\n<div>\n<p>Table 12.5<\/p>\n<p><span><img loading=\"lazy\" decoding=\"async\" src=\"\" alt=\"\" width=\"136\" height=\"127\"\/><\/span><\/p>\n<\/div>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>\u00a0<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p> <span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p>\u00a0<\/p>\n<p><span>82.<span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Use the information in Table 12.5. Using the simple moving average technique for the most recent three months, what will be the forecasted demand for November? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Less than or equal to 260 units <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Greater than 260, but less than or equal to 275 units <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Greater than 275, but less than or equal to 290 units <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 More than 290 units <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>83.<span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Use the information in Table 12.5. Using the weighted moving average technique and the following weights, what is the forecasted demand for November?<\/span><\/p>\n<table border=\"1\">\n<tbody>\n<tr>\n<td valign=\"top\" width=\"137\">\n<p><span>Time Period<\/span><\/p>\n<\/td>\n<td valign=\"top\" width=\"96\">\n<p><span>Weight<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\" width=\"137\">\n<p><span>Most recent month<\/span><\/p>\n<\/td>\n<td valign=\"top\" width=\"96\">\n<p><span>50%<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\" width=\"137\">\n<p><span>1 month ago<\/span><\/p>\n<\/td>\n<td valign=\"top\" width=\"96\">\n<p><span>20%<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\" width=\"137\">\n<p><span>2 months ago<\/span><\/p>\n<\/td>\n<td valign=\"top\" width=\"96\">\n<p><span>20%<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\" width=\"137\">\n<p><span>3 months ago<\/span><\/p>\n<\/td>\n<td valign=\"top\" width=\"96\">\n<p><span>10%<\/span><\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Less than or equal to 250 units <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Greater than 250 but less than or equal to 265 units <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Greater than 265 but less than or equal to 280 units <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 More than 280 units <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>84.<span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Use the information in Table 12.5. Using the exponential smoothing method, with alpha equal to 0.2, what is the forecasted demand for November? Use an initial value for the forecast equal to 277 units. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Less than or equal to 260 units <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Greater than 260 but less than or equal to 275 units <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Greater than 275 but less than or equal to 285 units <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 More than 285 units <\/span><\/p>\n<table align=\"left\">\n<tbody>\n<tr>\n<td width=\"36\">\u00a0<\/td>\n<\/tr>\n<tr>\n<td>\u00a0<\/td>\n<td width=\"594\">\n<table width=\"100%\">\n<tbody>\n<tr>\n<td>\n<div>\n<p>Table 12.6<\/p>\n<p><span><img loading=\"lazy\" decoding=\"async\" src=\"\" alt=\"\" width=\"154\" height=\"168\"\/><\/span><\/p>\n<\/div>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>\u00a0<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p> <span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p>\u00a0<\/p>\n<p><span>85.<span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Use the information in Table 12.6. Use an exponential smoothing model with a smoothing parameter of 0.30 to forecast sales for year 5. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Less than or equal to 2 <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Greater than 2 but less than or equal to 3 <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Greater than 3 but less than or equal to 4 <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Greater than 4 <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c(Time-Series Methods, moderate)<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>86.<span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Use the information in Table 12.6. Use the exponential smoothing method with <\/span><span>a<\/span><span> = 0.5 to forecast the sales for year 5. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Less than or equal to 3 <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Greater than 3 but less than or equal to 4 <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Greater than 4 but less than or equal to 5 <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Greater than 5 <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b(Time-Series Methods, moderate)<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>87.<span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Use the information in Table 12.6. The annual sales of the J. J. Company seem to exhibit a trend. Use trend-adjusted exponential smoothing to forecast annual sales in year 5.<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Note:<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 1. Use the forecast for year 4 as an estimate of the average demand.<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 2. <\/span><span>a<\/span><span> = 0.3; <\/span><span>b<\/span><span> = 0.2<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 3. An estimate of the trend in year 3 is 0.5.<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Less than or equal to 4 <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Greater than 4 but less than or equal to 5 <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Greater than 5 but less than or equal to 6 <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Greater than 6 <\/span><\/p>\n<table align=\"left\">\n<tbody>\n<tr>\n<td width=\"35\">\u00a0<\/td>\n<\/tr>\n<tr>\n<td>\u00a0<\/td>\n<td width=\"592\">\n<table width=\"100%\">\n<tbody>\n<tr>\n<td>\n<div>\n<p><span>Table 12.7<\/span><\/p>\n<p><span>TOMBOW is a small manufacturer of pencils and has had the following sales record for the most recent five months:<\/span><\/p>\n<p><span><img loading=\"lazy\" decoding=\"async\" src=\"\" alt=\"\" width=\"166\" height=\"158\"\/><\/span><\/p>\n<p><span>Use an exponential smoothing model to forecast sales in months 2, 3, 4, and 5. Let the smoothing parameter <\/span><span>a<\/span><span> equal 0.6; select F<span>1<\/span>\u00a0= 150 to get the forecast started.<\/span><\/p>\n<p>\u00a0<\/p>\n<\/div>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>\u00a0<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p> <span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p>\u00a0<\/p>\n<p><span>88.<span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Use the information in Table 12.7. The forecast for month 2 is <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 less than or equal to 120 units. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 greater than 120 but less than or equal to 140 units. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 greater than 140 but less than or equal to 160 units. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 greater than 160 units. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c(Time-Series Methods, moderate)<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>89.<span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Use the information in Table 12.7. The forecast for month 3 is <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 less than or equal to 140 units. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 greater than 140 but less than or equal to 160 units. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 greater than 160 but less than or equal to 180 units. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 greater than 180 units. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b(Time-Series Methods, moderate)<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>90.<span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Use the information in Table 12.7. The forecast for month 4 is <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 less than or equal to 140 units. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 greater than 140 but less than or equal to 150 <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 greater than 150 but less than or equal to 160 units. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 greater than 160 units. <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>91.<span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Use the information in Table 12.7. The forecast for month 5 is <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 less than or equal to 150 units. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 greater than 150 but less than or equal to 160 units. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 greater than 160 but less than or equal to 170 units. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 greater than 170 units. <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>92.<span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Use the information in Table 12.7. The cumulative sum of errors CFE from months 2 through 5 is <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 less than or equal to 80. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 greater than 80 but less than or equal to 85. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 greater than 87 but less than or equal to 90. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 greater than 90. <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>93.<span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Use the information in Table 12.7. What is the MAD for months 2 through five? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Less than or equal to 20 <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Greater than 20 but less than or equal to 25 <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Greater than 25 but less than or equal to 30 <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Greater than 30 <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>94.<span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>The Classical Consultant Company provides forecasting research for clients such as a group of five doctors associated with a new hospital health maintenance program. The company has been asked to forecast the number of patients requesting blood analysis per week. The past weekly average is 38 and for the trend is 2 per week. This week\u2019s demand was 42 blood tests. How many patients Will come next week? (Suppose <\/span><span>a<\/span><span> = 0.10 and <\/span><span>b<\/span><span> = 0.30.) <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Less than or equal to 39 <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Greater than 39 but less than or equal to 41 <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Greater than 41 but less than or equal to 43 <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Greater than 43 <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<table>\n<tbody>\n<tr>\n<td width=\"593\">\n<table width=\"100%\">\n<tbody>\n<tr>\n<td>\n<div>\n<p><span>Table 12.8<\/span><\/p>\n<p><span>A manager wants to forecast the monthly demand for a machine the company produces.<\/span><\/p>\n<p><span><img loading=\"lazy\" decoding=\"async\" src=\"\" alt=\"\" width=\"147\" height=\"182\"\/><\/span><\/p>\n<\/div>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>\u00a0<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p>\u00a0<\/p>\n<p><span>95.<span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Use the information in Table 12.8. Forecast the demand for the machine for month 7, using the three-month moving average method. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Less than or equal to 56 <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Greater than 56 but less than or equal to 58 <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Greater than 58 but less than or equal to 61 <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Greater than 61 <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>96.<span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Use the information in Table 12.8. Use the weighted moving average method to calculate the forecast for month 7. The weights are 0.50, 0.30, and 0.20, where 0.50 refers to the most recent demand. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Less than or equal to 56 <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Greater than 56 but less than or equal to 58 <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Greater than 58 but less than or equal to 61 <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Greater than 61 <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>97.<span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Use the information in Table 12.8. Calculate the MAD for months 4 through 6 for the three-month moving average forecasts. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Less than or equal to 2 <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Greater than 2 but less than or equal to 4 <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Greater than 4 but less than or equal to 6 <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Greater than 6 <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>98.<span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Use the information in Table 12.8. Calculate the MAD for months 4 through 6 for the weighted moving average forecasts. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Less than or equal to 2 <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Greater than 2 but less than or equal to 3 <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Greater than 3 but less than or equal to 4 <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Greater than 4 <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>99.<span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>The management of a company specializing in securities analysis has been using two forecasting methods to follow a new stock issue.<\/span><\/p>\n<p><span><img loading=\"lazy\" decoding=\"async\" src=\"\" alt=\"\" width=\"314\" height=\"168\"\/><\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Which one of the following statements is TRUE? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Based on MAD, the exponential smoothing approach is more accurate. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Based on CFE, the bias of the judgment forecasts is larger than the bias of the exponential smoothing forecasts. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Based on MAD, the judgmental method is more accurate. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Based on CFE, the bias of the exponential smoothing forecasts is steadily improving. <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>100.<span>\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Consider the following data concerning the performance of a forecasting method.<\/span><\/p>\n<p><span><img loading=\"lazy\" decoding=\"async\" src=\"\" alt=\"\" width=\"218\" height=\"158\"\/><\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 The CFE is greater than 100, and the MAD is less than 50. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 The CFE is less than 100, and the MAD is less than 50. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 The CFE is less than 100, and the MAD is greater than 50. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 The CFE is greater than 100, and the MAD is greater than 50. <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<table>\n<tbody>\n<tr>\n<td width=\"624\">\n<table width=\"100%\">\n<tbody>\n<tr>\n<td>\n<div>\n<p><span>Table 12.9<\/span><\/p>\n<p>\u00a0<\/p>\n<table border=\"1\">\n<tbody>\n<tr>\n<td valign=\"top\" width=\"48\">\n<p><span>Quarter<\/span><\/p>\n<\/td>\n<td valign=\"top\" width=\"192\">\n<p><span>Forecasted Demand (Units)<\/span><\/p>\n<\/td>\n<td valign=\"top\" width=\"156\">\n<p><span>Actual Demand (Units)<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\" width=\"48\">\n<p><span>1<\/span><\/p>\n<\/td>\n<td valign=\"top\" width=\"192\">\n<p><span>85<\/span><\/p>\n<\/td>\n<td valign=\"top\" width=\"156\">\n<p><span>95<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\" width=\"48\">\n<p><span>2<\/span><\/p>\n<\/td>\n<td valign=\"top\" width=\"192\">\n<p><span>55<\/span><\/p>\n<\/td>\n<td valign=\"top\" width=\"156\">\n<p><span>55<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\" width=\"48\">\n<p><span>3<\/span><\/p>\n<\/td>\n<td valign=\"top\" width=\"192\">\n<p><span>70<\/span><\/p>\n<\/td>\n<td valign=\"top\" width=\"156\">\n<p><span>45<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\" width=\"48\">\n<p><span>4<\/span><\/p>\n<\/td>\n<td valign=\"top\" width=\"192\">\n<p><span>60<\/span><\/p>\n<\/td>\n<td valign=\"top\" width=\"156\">\n<p><span>75<\/span><\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>\u00a0<\/p>\n<\/div>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>\u00a0<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p>\u00a0<\/p>\n<p><span>101.<span>\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Use the information in Table 12.9. What is the cumulative sum of forecast errors for the data? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 0 units<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 1\u201325 units <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 26\u201350 units<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Greater than 50 units <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>102.<span>\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Use the information in Table 12.9. What is the mean absolute deviation of forecast errors for the data? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 0 units<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 1\u201325 units <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 26\u201350 units<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Greater than 50 units <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>103.<span>\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Use the information in Table 12.9. What is the standard deviation of forecast errors for the data? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 0 units<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 1\u201310 units <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 11\u201320 units<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Greater than 20 units <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>104.<span>\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Use the information in Table 12.9. What is the mean absolute percent error for the data? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Less than 5 percent <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 5\u201312 percent <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 13\u201318 percent<br \/>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Greater than 18 percent <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>105.<span>\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Which one of the following reasons creates a pressure for reducing inventories? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 High interest or opportunity cost <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 On-time delivery requests from customers <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Need for better labor or equipment utilization <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Need for reduction in total payments to suppliers <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>106.<span>\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Which one of the following statements about anticipation inventory is TRUE? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 It is a portion of inventory that is reserved for the best customer.<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 It is a portion of inventory that is used to absorb only the variation in demand.<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 It is a portion of inventory that is used to absorb only the variation in supply.<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 It is a portion of inventory that is used to absorb variation in demand or supply.<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>107.<span>\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Pipeline inventory is a type of inventory that is usually maintained by<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 gasoline suppliers only.<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 electrical utilities only.<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 any manufacturer moving materials from point to point.<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 a trucking company making emergency shipments.<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>108.<span>\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>One of the secondary levers for reducing safety stock inventory is to reduce.<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 supply uncertainties.<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 setup cost. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 capacity cushions.<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 delivery size. <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>109.<span>\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>One of the secondary levers for reducing anticipation inventory is to <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 keep nonperishable product. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 reduce holding cost. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 add products with alternating demand cycles. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 accept only large orders. <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>110.<span>\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>One of the secondary levers for reducing pipeline inventory is to <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 offer seasonal pricing plans.<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 increase capacity cushions. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 accept only large orders.<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 select more responsive suppliers. <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>111.<span>\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>For a company that manufactures most of its products as standards, more inventory should be placed <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 closer to the customer. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 within the plant as work-in-process. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 close to suppliers. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 equally distributed between the plants and warehouses. <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>112.<span>\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>What is generally true about the class A items in ABC analysis? They represent <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 about 20 percent of all items.<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 about 30 percent of all items. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 about 20 percent of the dollar usage.<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 about 50 percent of the dollar usage. <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>113.<span>\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>The goal of ABC analysis is to <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 determine the profitability of items. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 estimate average volume per dollar value. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 estimate dollar value per pound. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 to identify the A items for better inventory control. <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>114.<span>\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Even though the economic order quantity (EOQ) is optimal only when five assumptions are satisfied, it serves as a reasonable first approximation even when these assumptions do not quite apply. Which one of the following is not an assumption of the EOQ? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Decisions for one item can be made independently of decisions made for other items. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 There is no uncertainty in lead time. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 The amount of an order received is exactly equal to what was ordered, without any \u201cshort shipments\u201d from a supplier or scrap losses in the shop. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Quantity discounts can be taken advantage of for large lot sizes. <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>115.<span>\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Which one of the following statements regarding the economic order quantity (EOQ) is TRUE? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 The EOQ model combines several different item orders to the same supplier. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 If an order quantity is larger than the EOQ, the annual holding cost for cycle inventory exceeds the annual ordering cost. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 The EOQ model assumes a variable demand pattern. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 When the interest rate drops, the inventory holding cost decreases and the EOQ decreases. <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>116.<span>\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Which one of the following statements concerning the economic order quantity (EOQ) model is TRUE? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 An increase in holding cost will increase the EOQ value. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 A decrease in demand will increase the EOQ value. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 A decrease in holding cost will increase the EOQ value. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 None of the above are true. <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>117.<span>\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Which one of the following statements concerning the economic order quantity (EOQ) is TRUE? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 The EOQ is the order quantity that minimizes annual inventory holding costs. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 An increase in demand will increase the EOQ value. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 The time between orders (TBO) will increase with an increase in holding costs.<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 The EOQ formula assumes that there are only three relevant costs: holding, transportation, and setup. <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>118.<span>\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>The Lemma Company manufactures and sells 10 products. Ways have been found to cut both the setup and inventory holding costs in half. What effect will this have on the economic order quantities of the 10 products? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 They will be reduced by a factor of 1.41. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 They will not change. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 They will be reduced by a factor of 2.00. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 They will be increased by a factor of 1.41. <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>119.<span>\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Sensitivity analysis on the economic order quantity (EOQ) formula can help the operations manager answer several questions on how to manage inventories. Which one of the following questions is NOT answered by EOQ sensitivity analysis? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 How critical are errors in estimating demand (D), inventory holding cost (H), and setup cost (S)? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 What should happen to lot sizes if interest rates drop? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 What should happen to cycle inventory if the demand rate increases? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 What should happen to lot sizes if supply and lead-time uncertainty increase? <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>120.<span>\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Which one of the following statements concerning a continuous review system is best? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 The inventory position (IP) of an item measures the item\u2019s ability to satisfy future demand, relying only on the on-hand inventory. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 An item\u2019s inventory position under a continuous review system increases by <em>Q<\/em> units as soon as an order is received. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 An item\u2019s on-hand inventory increases by <em>Q<\/em> units as soon as an order is placed. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Under a continuous review system, an item\u2019s inventory position corresponds to the on-hand inventory unless there are backorders or one or more scheduled receipts. <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>121.<span>\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Which one of the following descriptions best defines the cycle-service level as a measure of customer service? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 The preferred proportion of annual demand instantaneously filled from stock <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 The number of stockouts tolerated per year <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 The preferred proportion of days in the year when an item is in stock <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 The desired probability of not running out of stock in any one inventory cycle <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>122.<span>\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Which one of the following statements is best? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 The level of safety stock maintained decreases when the desired cycle-service level increases. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 The level of safety stock maintained decreases when the standard deviation of demand during lead time increases. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 When no safety stock is maintained, stockouts will occur during approximately 50 percent of the cycles. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 The level of safety stock maintained is greater if mean absolute deviation (MAD) is used rather than standard deviation in estimating forecast errors. <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>123.<span>\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>An inventory system answers two important questions: when to order and how much to order. Which of the following statements correctly explains how a <em>Q<\/em> system (continuous review system) or a <em>P<\/em> system (periodic review system) answers these questions? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Under a <em>Q<\/em> system, a fixed quantity is ordered every <em>P<\/em> time period. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Under a <em>Q<\/em> system, an order is placed to replenish the inventory position up to the target level <em>T<\/em> when the inventory position reaches the reorder point <em>R<\/em>. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Under a <em>P<\/em> system, a fixed quantity <em>Q<\/em> is ordered when the inventory position reaches the reorder point <em>R<\/em>. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Under a <em>P<\/em> system, an order is placed to replenish the inventory position up to the target level <em>T<\/em> every <em>P<\/em> time periods. <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>124.<span>\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Which one of the following statements is best? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 A <em>P<\/em> system requires more safety stock than a <em>Q<\/em> system. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 A <em>P<\/em> system lends itself more to quantity discounts than does a <em>Q<\/em> system. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 A <em>P<\/em> system requires more administrative control and computer support than does a <em>Q<\/em> system. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 In a periodic review system, the value of <em>Q<\/em> is kept the same from one cycle to another. <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>125.<span>\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Which one of the following statements represents an advantage of the <em>P<\/em> system over the <em>Q<\/em> system? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Less safety stock is carried to achieve the same service level. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 The replenishment intervals can be more easily individualized for items. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Orders can be more easily combined to the same supplier. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 A <em>P<\/em> system is more suitable for quantity discounts and capacity limitations. <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>126.<span>\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Which one of the following statements represents an advantage of a <em>Q<\/em> system over the <em>P<\/em> system? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 A perpetual inventory system is not mandatory. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Orders for multiple items from the same supplier can be combined more easily. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Fixed replenishment intervals are possible, which can be, administratively, quite convenient. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 The <em>Q<\/em> system is more suited for quantity discounts and physical limitations. <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>127.<span>\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Which one of the following statements about inventory control systems is best? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 A single-bin system is essentially a <em>P<\/em> system, with the target inventory and current inventory position established visually. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 A base-stock system minimizes ordering and setup costs by placing orders more infrequently. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 The base-stock system is mostly used for inexpensive items since it maximizes cycle inventory costs. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Visual systems are intended for use with high-value items like jet engines, that don\u2019t experience a steady demand. <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>128.<span>\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Which one of the following descriptions of a base-stock system is best? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 It is particularly attractive when review and ordering cost are both significant. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 It can be seen as a way to minimize cycle inventory. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Examples include gasoline storage tanks at a service station. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 An item\u2019s inventory is stored at two different locations or \u201cbins.\u201d <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>129.<span>\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Which one of the following statements about inventory control systems is true? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 A two-bin inventory system is essentially a <em>P<\/em> system because the inventory is reviewed only on a periodic basis. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 An optional replenishment system is particularly attractive when both review and ordering costs are significant. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Visual systems are difficult to administer because records on current inventory position have to be kept for every item. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Overstocking is quite common for those items that are managed by using the base-stock system. <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>130.<span>\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Which one of the following is NOT a method for tracking inventory and assuring accurate records? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Assign responsibility to specific employees for issuing and receiving materials <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Updating the reorder points to minimize safety stock <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Cycle counting <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Logic error checks <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>131.<span>\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Wood County Hospital consumed 400 boxes of bandages per week last year. The price of bandages was $80 per box, and the hospital operates 52 weeks per year. The cost of processing an order was $64, and the cost of holding one box throughout a full year was 20 percent of the value of the material.<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>Last year the hospital ordered bandages, on average, once every two weeks, each time ordering 800 boxes. What extra cost did the hospital incur that could have been avoided if the EOQ concept had been applied? <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Less than $650<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 More than $650 and less than $1050 <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 More than $1050 and less than $1450<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 More than $1450 <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<table align=\"left\">\n<tbody>\n<tr>\n<td width=\"37\">\u00a0<\/td>\n<\/tr>\n<tr>\n<td>\u00a0<\/td>\n<td width=\"590\">\n<table width=\"100%\">\n<tbody>\n<tr>\n<td>\n<div>\n<p><span>Table 13.1<\/span><\/p>\n<p><span>Fred Jacobs, assistant manager of Home and Hearth, is reviewing the costs associated with the store\u2019s best-selling frying pan. The data available to Mr. Jacobs concerning this frying pan follow.<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Demand = 20 units\/week<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Order cost\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 = $75\/order<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Holding cost\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 = $15\/unit\/year<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>Home and Hearth operates 50 weeks per year.<\/span><\/p>\n<p>\u00a0<\/p>\n<\/div>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>\u00a0<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p> <span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p>\u00a0<\/p>\n<p><span>132.<span>\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Use the information in Table 13.1. The current order quantity is 125 units per order. What is the total annual ordering cost and holding cost for this order size? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Less than or equal to $750 <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Greater than $750 but less than or equal to $1000 <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Greater than $1000 but less than or equal to $1250 <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Greater than $1250 <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>133.<span>\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Use the information in Table 13.1. Jacobs has recently learned of the economic order quantity in his business management class. If Home and Hearth implemented the EOQ, which of the following statements is TRUE? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 The annual order cost and holding cost would increase. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 The economic order quantity would be greater than 125 units. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 The annual order cost would increase. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 The annual holding cost would increase. <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>134.<span>\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>A neighborhood sportswear store sells a pair of Nike sneakers for $40. Due to the recent fitness craze, these shoes are in high demand: 50 pairs of shoes are sold per week. The ordering cost is $20\/order, and the annual holding cost is 20 percent of selling price. If the store operates 52 weeks a year, what can you say about the current lot size of 235? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Too large<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Too small <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Just right<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Cannot tell from the information given <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>135.<span>\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>An item experiences an annual demand of 7200 units. It costs $8 to hold an item in inventory for one year and $16 to place an order. If the EOQ model is used, what is the time between orders? Assume that there are 52 business weeks in a year. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Less than 1 week <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Greater than 1 week but less than or equal to 2 weeks <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Greater than 2 weeks but less than or equal to 3 weeks <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Greater than 3 weeks <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<table>\n<tbody>\n<tr>\n<td width=\"593\">\n<table width=\"100%\">\n<tbody>\n<tr>\n<td>\n<div>\n<p><span>Table 13.2<\/span><\/p>\n<p><span>Consider the following data for an independent demand item maintained by Vicki Crittenden, the proprietor of a local auto repair shop:<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Weekly demand = 50 units<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Ordering cost = $8\/order<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Holding cost\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 = $4\/order<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Weeks in a year = 50<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<\/div>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>\u00a0<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p>\u00a0<\/p>\n<p><span>136.<span>\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Use the information in Table 13.2. If Crittenden uses the EOQ model, how frequently must she place orders for this item? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Every week <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Every 2 weeks<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Every 3 weeks<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Every 4 weeks <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>137.<span>\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Use the information in Table 13.2. Due to new ordering procedures initiated by Crittenden, the ordering cost is dropping to $4\/order. At the same time, the weekly demand increases to 64 units per week due to an increase in business. What effect do these changes have on the EOQ quantity for this item? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 The EOQ quantity remains unchanged. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 The EOQ quantity increases by 20 percent. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 The EOQ quantity decreases by 20 percent. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Sufficient information is not available for answering this question. <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>138.<span>\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Sark Incorporated is out of stock for a key item, which has a backorder of 200 units. An open order of 750 units is scheduled for arrival on the following Monday. What is the current inventory position at Sark? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Less than or equal to 0 units <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Greater than 0 but less than or equal to 500 units <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Greater than 500 but less than or equal to 750 units <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Greater than 750 units <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>139.<span>\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>For an item under continuous review, the on-hand inventory is only 20 units and the reorder point <em>R<\/em> is 100 units. There are no backorders, but there is one open order for 90 units. Which one of the following statements is TRUE? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 There is no need to order at the present time. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 The current inventory position is 100 units. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 An order should be placed now for 20 units. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 An order should be placed now for 10 units. <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>140.<span>\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>On-hand inventory of an item is only 10 units, and the reorder point R is 135. There are no backorders, and an open order of 110 units is scheduled to arrive next week. Which one of the following statements is TRUE? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 There is no need to order at the present time. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 A new order should be issued now. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 The current inventory position for this item is 125 units. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 The current inventory position for this item is 110 units. <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>141.<span>\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>The Franklin County Hospital is currently using a continuous review system to control its inventory. One of the items in inventory is an elastic band. The average demand for this item is 200 boxes per week, and the standard deviation in weekly demand is 50 boxes. If the lead time is 3 weeks and the hospital wants a 99 percent cycle-service level, what is the reorder point for this item? A normal table is appended to this exam. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Less than 650 boxes <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Greater than 650 boxes but less than 750 boxes <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Greater than 750 boxes but less than 850 boxes <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Greater than 850 boxes <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>142.<span>\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Demand for an item is 1000 units per week, with a standard deviation in weekly demand of 60 units. The lead time is 2 weeks. The company wants to maintain an 88 percent cycle-service level. Assume demand during lead time to be normally distributed. For a continuous review system, what should be the reorder point? A normal table is attached at the end of this exam. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Less than 2075<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Between 2075 and 2085 <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Between 2085 and 2095<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Greater than 2095 <\/span><\/p>\n<table align=\"left\">\n<tbody>\n<tr>\n<td width=\"34\">\u00a0<\/td>\n<\/tr>\n<tr>\n<td>\u00a0<\/td>\n<td width=\"597\">\n<table width=\"100%\">\n<tbody>\n<tr>\n<td>\n<div>\n<p>Table 13.3<\/p>\n<p><span>The Medfield Import Autoparts Company imports and sells standard air filters for most Japanese cars, and it operates under the continuous review system. The average demand for this item is 1200 units per month (14,400 per year), and the standard deviation in monthly demand is 250 units. It costs the company $225 to process each order, and the lead time is 2 months. The holding cost for one unit is $0.50 per year, and the company policy is to maintain a 95 percent cycle-service level. A normal table is appended to this exam.<\/span><\/p>\n<p>\u00a0<\/p>\n<\/div>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>\u00a0<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p> <span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p>\u00a0<\/p>\n<p><span>143.<span>\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Use the information in Table 13.3. What is the EOQ (economic order quantity) for this air filter? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Less than 2,000 units <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Greater than 2,000 units but less than 3,000 units <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Greater than 3,000 units but less than 4,000 units <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Greater than 4,000 units <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>144.<span>\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Use the information in Table 13.3. What is the reorder point R to satisfy a 95 percent cycle-service level? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Less than 2800 units <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Greater than 2800 units but less than 2900 units <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Greater than 2900 units but less than 3000 units <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Greater than 3000 units <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>145.<span>\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Use the information in Table 13.3. What is the reorder point R if the cycle-service level is brought down to 80 percent? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Less than 2800 units <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Greater than 2800 units but less than 2900 units <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Greater than 2900 units but less than 3000 units <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Greater than 3000 <\/span><\/p>\n<table align=\"left\">\n<tbody>\n<tr>\n<td width=\"34\">\u00a0<\/td>\n<\/tr>\n<tr>\n<td>\u00a0<\/td>\n<td width=\"588\">\n<table width=\"100%\">\n<tbody>\n<tr>\n<td>\n<div>\n<p><span>Table 13.4<\/span><\/p>\n<p><span>A company operating under a continuous review system has an average demand of 50 units per week for the item it produces. The standard deviation in weekly demand is 20 units. The lead time for the item is 6 weeks, and it costs the company $30 to process each order. The holding cost for each unit is $10 per year. The company operates 52 weeks per year. A normal table is appended to this exam.<\/span><\/p>\n<p>\u00a0<\/p>\n<\/div>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>\u00a0<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p> <span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p>\u00a0<\/p>\n<p><span>146.<span>\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Use the information in Table 13.4. What is the economic order quantity (EOQ) for this item? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Less than 175 units <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Greater than 175 units but less than or equal to 200 units <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Greater than 200 units but less than or equal to 225 units <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Greater than 225 units <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>147.<span>\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Use the information in Table 13.4. What is the desired safety stock level if the company has a policy of maintaining a 90 percent cycle-service level? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Less than 50 units<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Between 50 units and 100 units <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Between 100 units and 150 units<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Greater than 150 units <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>148.<span>\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Use the information in Table 13.4. What is the reorder point if the company finally decides to have a 95 percent cycle-service level? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Less than or equal to 300 units<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Between 300 and 325 units <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Between 325 and 350 units<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Greater than 350 units <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<table>\n<tbody>\n<tr>\n<td width=\"594\">\n<table width=\"100%\">\n<tbody>\n<tr>\n<td>\n<div>\n<p><span>Table 13.5<\/span><\/p>\n<p><span>You are the operations manager of a firm that uses the continuous review inventory control system. Suppose the firm operates 52 weeks a year and has the following characteristics for its primary item:<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Demand = 25,000 units\/year<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Ordering cost = $30\/order<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Holding cost\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 = $8\/unit\/year <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Lead time = 2 weeks <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Standard deviation in weekly demand = 100 units<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>A normal table is appended to this exam.<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<\/div>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>\u00a0<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p>\u00a0<\/p>\n<p><span>149.<span>\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Use the information in Table 13.5. What safety stock level provides a 95 percent cycle-service level? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Less than 150 units<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Between 150 and 200 units <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Between 200 and 250 units<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Greater than 250 units <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>150.<span>\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Use the information in Table 13.5. What is the economic order quantity for this item? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Less than 400 units <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Between 400 and 450 units <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Between 450 and 500 units<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Greater than 500 units <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<table>\n<tbody>\n<tr>\n<td width=\"576\">\n<table width=\"100%\">\n<tbody>\n<tr>\n<td>\n<div>\n<p><span>Table 13.6<\/span><\/p>\n<p><span>Peterson Enterprises uses a continuous review inventory control system. The firm operates 50 weeks per year and has the following characteristics for an item:<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Demand = 50,000 units\/year<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Ordering cost = $35\/order<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Holding cost\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 = $2\/unit\/year<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Lead time = 3 weeks<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Standard deviation in weekly demand = 125 units<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>A normal table is appended to this exam.<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<\/div>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>\u00a0<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p>\u00a0<\/p>\n<p><span>151.<span>\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Use the information in Table 13.6. What is the EOQ for this item? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Less than 1100 units<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Between 1100 and 1200 units <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Between 1200 and 1300 units<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 More than 1300 units <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>152.<span>\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Use the information in Table 13.6. If Peterson wishes to provide a 90 percent cycle-service level, what is the reorder point? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Less than or equal to 2700 units <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Greater than 2700 but less than or equal to 3100 units <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Greater than 3100 but less than or equal to 3500 units <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Greater than 3500 units <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>153.<span>\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Cynthia Korinsky, manager of a large medical supply house that operates 50 weeks per year and 5 days per week, has decided to implement a periodic review system for all class A items. One such item has the following characteristics:<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Demand = 10,000 units\/year (or 40 units per workday)<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Order cost\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 = $50\/order<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Holding cost\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 = $5\/unit\/year<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>If Korinsky wishes to minimize total cost (thereby approximating the EOQ), what should be <em>P<\/em>, the number of workdays between orders? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Less than or equal to 10 days <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Greater than 10 days but less than or equal to 12 days <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Greater than 12 days but less than or equal to 14 days <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Greater than 14 days <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<table>\n<tbody>\n<tr>\n<td width=\"580\">\n<table width=\"100%\">\n<tbody>\n<tr>\n<td>\n<div>\n<p><span>Table 13.7<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Demand = 5200 units\/year <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Standard deviation of weekly demand = 11 units<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Ordering costs = $45\/order<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Holding costs = $2\/unit\/year<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Cycle-service level\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 = 90% (<em>z<\/em> for 90% = 1.28)<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Lead time = 3 weeks<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Number of weeks per year = 52 weeks<\/span><\/p>\n<\/div>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>\u00a0<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p>\u00a0<\/p>\n<p><span>154.<span>\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Use the information in Table 13.7. If a firm uses the continuous review system to control the inventory, what would be the reorder point? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 0 units<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Between 1 and 300 units <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Between 301 and 600 units<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Above 600 units <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>155.<span>\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Use the information in Table 13.7. The firm decided to change to the periodic review system to control the item\u2019s inventory. For the most recent review, an inventory clerk checked the inventory of this item and found 500 units. There were no scheduled receipts at the time. How many units should be ordered? (HINT: Use the EOQ model to derive <em>P<\/em>, the time between reviews.) <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 0 units<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Between 1 and 300 units <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Between 301 and 600 units<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Above 600 units <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>156.<span>\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Your firm uses a continuous review system (Q system), where the inventory position is updated after every transaction. The firm operates 52 weeks per year. One of the items has the following characteristics:<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>Demand = 14,560 units per year<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Ordering cost = $40 per order<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Holding cost\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 = $6 per unit per year<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Lead time = 2 weeks <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Standard deviation in weekly demand = 100 units<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Cycle-service level\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 = 80 percent<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 If <em>Q<\/em> is made equal to the EOQ, what are the desired values for <em>Q<\/em> and <em>R<\/em>? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 <em>Q<\/em> is between 65 and 69, and <em>R<\/em> is between 398 and 402. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 <em>Q<\/em> is between 65 and 69, and <em>R<\/em> is between 362 and 366. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 <em>Q<\/em> is between 439 and 443, and <em>R<\/em> is between 678 and 682. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 <em>Q<\/em> is between 439 and 443, and <em>R<\/em> is between 559 and 563. <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<table>\n<tbody>\n<tr>\n<td width=\"574\">\n<table width=\"100%\">\n<tbody>\n<tr>\n<td>\n<div>\n<p><span>Table 13.8<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Demand = 52,000 units\/year<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Standard deviation of weekly demand = 110 units<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Ordering costs = $45\/order<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Holding costs = $0.50\/unit\/year<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Cycle-service level\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 = 90%<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Lead time = 2 weeks<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Number of weeks per year = 52 weeks<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>A normal table is appended to this exam.<\/span><\/p>\n<\/div>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>\u00a0<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p>\u00a0<\/p>\n<p><span>157.<span>\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Use the information in Table 13.8. A firm uses the periodic review system to control the item depicted above. It reviews the item\u2019s status every three weeks (<em>P<\/em> = 3). At the most recent review an inventory clerk just checked the inventory of this item and found 1500 units. There were no scheduled receipts and no back orders. How many units should be ordered? (Hint: You must calculate <em>T<\/em> before answering this question.) <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 0 units<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Between 1 and 3750 units <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Between 3751 and 4000 units<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Greater than 4000 units <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>158.<span>\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Use the information in Table 13.8. If the firm changed to a continuous review system, what would be the reorder point? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 0 units<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Between 1 and 1000 units <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Between 1000 and 2000 units<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Greater than 2000 units <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>159.<span>\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Use the information in Table 13.8. What is the EOQ for this item? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Between 1 and 1500 units<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Between 1501 and 3000 units <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Between 3001 and 4500 units<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Greater than 4500 units <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<table>\n<tbody>\n<tr>\n<td width=\"591\">\n<table width=\"100%\">\n<tbody>\n<tr>\n<td>\n<div>\n<p><span>Table 13.9<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Demand = 140 units\/week <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Standard deviation in weekly demand = 21 units<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Ordering cost = $20\/order<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Holding cost\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 = $1 per unit per year<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Cycle-service level\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 = 85 percent<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Lead time = 6 weeks<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>A normal table is appended to this exam.<\/span><\/p>\n<\/div>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>\u00a0<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p>\u00a0<\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 <\/span><\/p>\n<p><span>160.<span>\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Use the information in Table 13.9. Design a continuous review system making Q equal to EOQ. What will be the economic order quantity (EOQ)? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Less than 560<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Between 560 and 575 <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Between 575 and 590<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 More than 590 <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>161.<span>\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Use the information in Table 13.9. Assume demand during lead time to be normally distributed. For a continuous review system, what should be the reorder point (<em>R<\/em>)? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Less than 870<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Between 870 and 900 <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Between 900 and 930<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 More than 930 <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>162.<span>\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Use the information in Table 13.9. Design a periodic review system with <em>P<\/em> = 4 weeks. Assume demand during lead time plus review period to be normally distributed. What target inventory will provide the desired cycle-service level of 85 percent? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Less than 1400 units<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Between 1400 and 1425 units <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Between 1425 and 1450 units<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Greater than 1450 units <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>163.<span>\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Jan Tuttle is the inventory manager of an art supply store. She uses a periodic review system for all oil paints. The number of periods between orders (<em>P<\/em>) for red #69 is 15 workdays. (The store operates 50 weeks\/year, 5 workdays\/week.) Additional information concerning red #69 follows.<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>Demand = 30 units\/workday<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Standard deviation of daily demand = 4 units\/workday<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Lead time = 7 workdays<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Desired cycle-service level = 85 percent<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 A normal table is appended to this exam. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 What is the target inventory level <em>T<\/em> for red #69? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Less than or equal to 550 <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Greater than 550 but less than or equal to 600 <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Greater than 600 but less than or equal to 650 <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Greater than 650 <\/span><\/p>\n<table align=\"left\">\n<tbody>\n<tr>\n<td width=\"34\">\u00a0<\/td>\n<\/tr>\n<tr>\n<td>\u00a0<\/td>\n<td width=\"588\">\n<table width=\"100%\">\n<tbody>\n<tr>\n<td>\n<div>\n<p><span>Table 13.10<\/span><\/p>\n<p><span>A firm using the periodic review system (<em>P<\/em> system) reviews the status of an item every 4 weeks. The standard deviation in weekly demand is 60 units. The lead time for the item is 3 weeks, whereas demand averages 200 units per week. A normal table is appended to this exam.<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<\/div>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>\u00a0<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p> <span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p>\u00a0<\/p>\n<p><span>164.<span>\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Use the information in Table 13.10. How much safety stock should be held to achieve a 95 percent cycle service level? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Less than 270 units <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Greater than 270 but less than or equal to 285 units <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Greater than 285 but less than or equal to 300 units <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Greater than 300 units <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>165.<span>\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Use the information in Table 13.10. Suppose the firm decides on a safety stock (<em>B<\/em>) of 245 units. It is time to review the item, and the current inventory position is 700 units. How many units should be ordered? (Hint: Before answering this question, you must first compute <em>T<\/em>, the target inventory level.) <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Less than 900 units <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Greater than 900 but less than or equal to 950 units <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Greater than 950 but less than or equal to 1000 units <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Greater than 1000 units <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<table>\n<tbody>\n<tr>\n<td width=\"590\">\n<table width=\"100%\">\n<tbody>\n<tr>\n<td>\n<div>\n<p><span>Table 13.11<\/span><\/p>\n<p><span>The following information has been collected on an independent demand item:<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Demand = 30 units per week <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 \u00a0(assume 52 weeks\/ year)<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Ordering and setup cost = $50 per order<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Holding cost = $8 per unit per year<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Lead time = 1 week<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Standard deviation in weekly demand = 8 units<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Cycle-service level\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 = 90 percent<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>A normal table is appended to this exam.<\/span><\/p>\n<\/div>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>\u00a0<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p>\u00a0<\/p>\n<p><span>166.<span>\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Use the information from Table 13.11. Design a continuous review system (<em>Q<\/em> system) for this item, making <em>Q<\/em> equal to the EOQ. Assume that the demand during lead time is normally distributed. What are the desired values for <em>Q<\/em> and <em>R<\/em>? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 <em>Q<\/em> is between 138 and 142, while <em>R<\/em> is between 34 and 38. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 <em>Q<\/em> is between 121 and 125, while <em>R<\/em> is between 80 and 84. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 <em>Q<\/em> is between 138 and 142, while <em>R<\/em> is between 39 and 42. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 <em>Q<\/em> is between 121 and 125, while <em>R<\/em> is between 53 and 57. <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>167.<span>\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Use the information from Table 13.11. Design a periodic review system (<em>P<\/em> system), with <em>P<\/em> = 5 weeks. What target inventory <em>T<\/em> will provide the desired 90 percent cycle-service level? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Between 53 and 57 units<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Between 172 and 176 units <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Between 188 and 192 units<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Between 202 and 206 units <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>168.<span>\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>In a waiting line problem, increasing advertising expenditures, increasing the number of promotions, or changing the price of a service is most likely to affect <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 customer arrival rates.<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 service rates. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 the priority rule.<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 the line arrangement. <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>169.<span>\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>In a waiting-line problem, assigning additional employees to a service facility will have a direct effect on <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 the line arrangement.<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 service rates. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 the size of the customer population.<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 the number of service phases. <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>170.<span>\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>With a single-server model, increasing the service rate holding all other factors constant will <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 increase the utilization of the server. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 increase the time spent per customer. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 decrease the probability that there are two customers in the system at any time. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 decrease the arrival rate of customers. <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>171.<span>\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>With a single-server model, increasing the promotions for a service through advertising will most likely <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 increase the utilization of the server. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 decease the average number of customers in the service system. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 decrease the average time a customer spends in the system. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 increase the probability that the server will be idle. <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>172.<span>\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>With a single-server model, increasing the capital-to-labor ratio will most likely <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 increase the utilization of the server. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 have no effect on the operating characteristics because they are only affected by work methods changes. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 decrease the probability that there are zero customers in the system at any time. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 decrease the average number of customers in the waiting line. <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>173.<span>\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>With a single-server model, increasing the arrival rate by 10% and also increasing the service rate by 10% will result in <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 an increase in the utilization of the server. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 an increase in the average number of customers in the system. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 a decrease in the average time spent in the system, including service. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 an increase in the waiting line time. <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>174.<span>\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>With a single-server model, increasing the arrival rate by 10% and also increasing the service rate by 10% will result in <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 a decrease in the utilization of the server. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 no change in the average number of customers in the service system. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 an increase in the average number of customers in the waiting line. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 an increase in the waiting time in line. <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>175.<span>\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>With a single-server model, increasing the arrival rate by 10% and also increasing the service rate by 10% will result in <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 no change in the probability that there are <em>n<\/em> customers in the system. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 a decrease in the average waiting time in line. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 an increase in the average time spent in the system, including service. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 an increase in the average number of customers in the system. <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>176.<span>\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>With a multiple-server model, increasing the arrival rate by 10% and also increasing the service rate of each server by 10% will result in <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 a decrease in the utilization of the system. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 no change in the average number of customers in the waiting line. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 a decrease in the average number of customers in the waiting line. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 an increase in the waiting time in line. <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>177.<span>\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>With a finite-source model, increasing the arrival rate by 10% and also increasing the service rate by 10% will result in <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 an increase in the utilization of the server. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 an increase in the average number of customers in the service system. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 a decrease in the average time spent in the system, including service. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 an increase in the waiting time in line. <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>178.<span>\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>With a finite-source model, increasing the arrival rate by 10% and also increasing the service rate by 10% will result in <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 a decrease in the utilization of the server. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 no change in the average number of customers in the system. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 an increase in the average number of customers in the waiting line. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 an increase in the waiting time in line. <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>179.<span>\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>An automatic, drive-through car wash is an example of a <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 single-channel, single-phase arrangement. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 single-channel, multiple-phase arrangement. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 multiple-channel, single-phase arrangement. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 multiple-channel, multiple-phase arrangement. <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>180.<span>\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>A drive-through system at a McDonald\u2019s restaurant where the first facility takes the order, the second takes the money, and the third provides the food is an example of <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 single-channel, single-phase arrangement. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 single-channel, multiple-phase arrangement. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 multiple-channel, single-phase arrangement. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 multiple-channel, multiple-phase arrangement. <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>181.<span>\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>A bank lobby with six teller windows each with a separate line is an example of a <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 single-channel, single-phase arrangement. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 single-channel, multiple-phase arrangement. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 multiple-channel, single-phase arrangement. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 multiple-channel, multiple-phase arrangement. <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>182.<span>\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>A laundromat, where there are washing machines and drying machines, is an example of a <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 single-channel, single-phase arrangement. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 single-channel, multiple-phase arrangement. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 multiple-channel, single-phase arrangement. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 multiple-channel, multiple-phase arrangement. <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>183.<span>\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>In the single-server model <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 customers are assumed to arrive at constant intervals of time. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 the variability of customer arrivals is described by a Poisson distribution. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 the mean of the distribution of customer arrivals must be greater than the variance of customer arrivals to get meaningful results. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 the probability of <em>n<\/em> arrivals in <em>T<\/em> time periods comes from a normal distribution. <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>184.<span>\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>In the single-server model, <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 the service time of a customer comes from an exponential distribution. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 the service time depends on the number of customers in the system so long as there is at least one customer in the waiting line. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 the mean of the service time distribution must be as great as the target service time for a feasible solution. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 service times are always constant to avoid large waiting lines. <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>185.<span>\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>A super computer accessory discount store often has customers that leave the checkout line before being served because of excessive waiting times. The store has a(n)<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 infinite customer population with balking customers. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 infinite customer population with reneging customers. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 finite customer population with balking customers. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 finite customer population with reneging customers. <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>186.<span>\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>A homemade ice cream shop owner has noticed that often potential customers will stop outside the store, assess the wait in line, and then pass by. The shop has a(n)<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 infinite customer population with balking customers. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 infinite customer population with reneging customers. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 finite customer population with balking customers. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 finite customer population with reneging customers. <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>187.<span>\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>The owner of a desktop publishing company has seven loyal clients who periodically require his services. The owner has <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 an infinite customer population of patient customers. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 an infinite population of impatient customers. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 a finite customer population. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 a finite customer population with balking customers. <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>188.<span>\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Customers arrive according to a Poisson distribution. The average number of customer arrivals per hour is 4. The probability that 3 customers will arrive in the next 2 hours is <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 less than or equal to 0.015. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 greater than 0.015 but less than or equal to 0.020. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 greater than 0.020 but less than or equal to 0.025. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 greater than 0.025. <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>189.<span>\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Customers arrive according to a Poisson distribution. The average number of customer arrivals per hour is 6. The probability that 4 customers will arrive in the next 3 hours is <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 less than or equal to 0.01. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 greater than 0.01 but less than or equal to 0.02. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 greater than 0.02 but less than or equal to 0.03. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 greater than 0.03. <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>190.<span>\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Customers arrive according to a Poisson distribution. The average number of customer arrivals per hour is 3. The probability that 4 customers will arrive in the next 2 hours is <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 less than or equal to 0.10. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 greater than 0.10 but less than or equal to 0.12. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 greater than 0.12 but less than or equal to 0.14. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 greater than 0.14. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c(Probability Distributions, moderate)<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>191.<span>\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Customers arrive according to a Poisson distribution. The average number of customer arrivals per hour is 2. The probability that 5 customers will arrive in the next 3 hours is <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 less than or equal to 0.10. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 greater than 0.10 but less than or equal to 0.12. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 greater than 0.12 but less than or equal to 0.14. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 greater than 0.14. <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>192.<span>\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Customers are serviced at a rate of 4 customers per hour according to an exponential distribution. What is the probability that a customer will require less than 30 minutes? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Less than or equal to 0.50 <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Greater than 0.50 but less than or equal to 0.60 <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Greater than 0.60 but less than or equal to 0.70 <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Greater than 0.70 <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>193.<span>\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Customers are serviced at a rate of 6 customers per hour according to an exponential distribution. What is the probability that a customer will require less than 20 minutes? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Less than or equal to 0.70 <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Greater than 0.70 but less than or equal to 0.80 <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Greater than 0.80 but less than or equal to 0.90 <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Greater than 0.90 <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>194.<span>\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Customers are serviced at a rate of 3 customers per hour according to an exponential distribution. What is the probability that a customer will require less than 10 minutes? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Less than or equal to 0.40 <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Greater than 0.40 but less than or equal to 0.45 <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Greater than 0.45 but less than or equal to 0.50 <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Greater than 0.50 <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>195.<span>\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Customers are serviced at a rate of 5 customers per hour according to an exponential distribution. What is the probability that a customer will require less than 20 minutes? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Less than or equal to 0.75 <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Greater than 0.75 but less than or equal to 0.80 <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Greater than 0.80 but less than or equal to 0.85 <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Greater than 0.85 <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>196.<span>\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Customers are serviced at a rate of 10 customers per hour according to an exponential distribution. What is the probability that a customer will require less than 2 minutes? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Less than or equal to 0.25 <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Greater than 0.25 but less than or equal to 0.30 <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Greater than 0.30 but less than or equal to 0.35 <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Greater than 0.35 <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<table align=\"left\">\n<tbody>\n<tr>\n<td width=\"37\">\u00a0<\/td>\n<\/tr>\n<tr>\n<td>\u00a0<\/td>\n<td width=\"590\">\n<table width=\"100%\">\n<tbody>\n<tr>\n<td>\n<div>\n<p><span>Table C.1<\/span><\/p>\n<p><span>The athletic boosters club at Southville High plans a car wash to raise funds for the sports program. An average of 10 cars per hour are expected to arrive according to a Poisson distribution. They will be served at an average rate of 12 cars per hour, with exponential service times.<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<\/div>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>\u00a0<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p> <span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p>\u00a0<\/p>\n<p><span>197.<span>\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Use the information in Table C.1. What is the average utilization of the car wash operation? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Less than or equal to 75% <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Greater than 75% but less than or equal to 80% <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Greater than 80% but less than or equal to 85% <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Greater than 85% <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>198.<span>\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Use the information in Table C.1. What is the average number of cars in the system? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Less than or equal to 4 <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Greater than 4 but less than or equal to 5 <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Greater than 5 but less than or equal to 6 <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Greater than 6 <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>199.<span>\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Use the Information in Table C.1. What is the average number of cars in line? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Less than or equal to 5 <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Greater than 5 but less than or equal to 6 <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Greater than 6 but less than or equal to 7 <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Greater than 7 <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>200.<span>\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Use the information in Table C.1. What is the average time spent in the system? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Less than or equal to 0.35 hour <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Greater than 0.35 hour but less than or equal to 0.40 hour <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Greater than 0.40 hour but less than or equal to 0.45 hour <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Greater than 0.45 hour <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>201.<span>\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Use the information in Table C.1. What is the average time spent in line? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Less than or equal to 20 minutes <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Greater than 20 minutes but less than or equal to 30 minutes <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Greater than 30 minutes but less than or equal to 40 minutes <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Greater than 40 minutes <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>202.<span>\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Use the information in Table C.1. What is the probability of having more than 3 cars in the system? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Less than or equal to 0.45 <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Greater than 0.45 but less than or equal to 0.50 <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Greater than 0.50 but less than or equal to 0.55 <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Greater than 0.55 <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<table>\n<tbody>\n<tr>\n<td width=\"595\">\n<table width=\"100%\">\n<tbody>\n<tr>\n<td>\n<div>\n<p><span>Table C.2<\/span><\/p>\n<p><span>A young entrepreneur wants to set up a lemonade stand at a busy intersection. Customers arrive at a rate of 40 per hour according to a Poisson distribution. Customers will be served at the average rate of 60 per hour with exponential service times.<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<\/div>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>\u00a0<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p>\u00a0<\/p>\n<p><span>203.<span>\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Use the information in Table C.2. What is the average utilization of the entrepreneur? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Less than or equal to 50% <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Greater than 50% but less than or equal to 60% <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Greater than 60% but less than or equal to 70%<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Greater than 70% <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>204.<span>\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Use the information in Table C.2. What is the average number of customers in the system? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Less than or equal to 1 <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Greater than 1 but less than or equal to 2 <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Greater than 2 but less than or equal to 3 <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Greater than 3 <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>205.<span>\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Use the information in Table C.2. What is the average number of customers in line? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Less than or equal to 1 <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Greater than 1 but less than or equal to 2 <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Greater than 2 but less than or equal to 3 <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Greater than 3 <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>206.<span>\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Use the information in Table C.2. What is the average time spent in the system? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Less than or equal to 1 minute <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Greater than 1 minute but less than or equal to 2 minutes <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Greater than 2 minutes but less than or equal to 3 minutes <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Greater than 3 minutes <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>207.<span>\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Use the information in Table C.2. What is the average time spent in line? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Less than or equal to 1.5 minutes <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Greater than 1.5 minutes but less than or equal to 2.5 minutes <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Greater than 2.5 minutes but less than or equal to 3.5 minutes <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Greater than 3.5 minutes <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>208.<span>\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Use the information in Table C.2. What is the probability of having more than 2 customers in the system? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Less than or equal to 0.35 <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Greater than 0.35 but less than or equal to 0.40 <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Greater than 0.40 but less than or equal to 0.45 <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Greater than 0.45 <\/span><\/p>\n<table align=\"left\">\n<tbody>\n<tr>\n<td width=\"36\">\u00a0<\/td>\n<\/tr>\n<tr>\n<td>\u00a0<\/td>\n<td width=\"583\">\n<table width=\"100%\">\n<tbody>\n<tr>\n<td>\n<div>\n<p><span>Table C.3<\/span><\/p>\n<p><span>Customers arrive at a bank\u2019s facility at the rate of 40 per hour, according to a Poisson distribution. There are 2 separate teller windows, each one capable of serving 30 customers per hour on the average with exponential service times. Customers form one line, going to the first available teller.<\/span><\/p>\n<\/div>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>\u00a0<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p> <span>\u00a0<\/span><\/p>\n<p>\u00a0<\/p>\n<p><span>209.<span>\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Use the information in Table C.3. What is the average utilization of the two-window system? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Less than or equal to 50% <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Greater than 50% but less than or equal to 60% <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Greater than 60% but less than or equal to 70% <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Greater than 70% <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>210.<span>\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Use the information in Table C.3. What is the average number of customers waiting in line for service? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Less than or equal to 2 <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Greater than 2 but less than or equal to 3 <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Greater than 3 but less than or equal to 4 <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Greater than 4 <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>211.<span>\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Use the information in Table C.3. What is the average waiting time in line? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Less than or equal to 1 minute <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Greater than 1 minute but less than or equal to 1.5 minutes <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Greater than 1.5 minutes but less than or equal to 2 minutes <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Greater than 2 minutes <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>212.<span>\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Use the information in Table C.3. What is the average time spent in the system? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Less than or equal to 2 minutes <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Greater than 2 minutes but less than or equal to 2.5 minutes <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Greater than 2.5 minutes but less than or equal to 3 minutes <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Greater than 3 minutes <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>213.<span>\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Use the information in Table C.3. What is the average number of customers in the system? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Less than or equal to 2 <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Greater than 2 but less than or equal to 2.5 <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Greater than 2.5 but less than or equal to 3 <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 greater than 3 <\/span><\/p>\n<table align=\"left\">\n<tbody>\n<tr>\n<td width=\"37\">\u00a0<\/td>\n<\/tr>\n<tr>\n<td>\u00a0<\/td>\n<td width=\"566\">\n<table width=\"100%\">\n<tbody>\n<tr>\n<td>\n<div>\n<p><span>Table C.4<\/span><\/p>\n<p><span>Customers arrive at a ticket counter at the rate of 50 customers per hour, according to a Poisson distribution. There are 3 ticket agents. Customers select the first available agent from one line. Each agent can process 20 customers per hour with exponential service. times.<\/span><\/p>\n<\/div>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>\u00a0<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p> <span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p>\u00a0<\/p>\n<p><span>214.<span>\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Use the information in Table C.4. What is the average utilization of the three-agent system? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Less than or equal to 80% <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Greater than 80% but less than or equal to 85% <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Greater than 85% but less than or equal to 90% <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Greater than 90% <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>215.<span>\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Use the information in Table C.4. What is the average number of customers waiting in line for service? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Less than or equal to 4 <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Greater than 4 but less than or equal to 4.5 <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Greater than 4.5 but less than or equal to 5 <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Greater than 5 <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>216.<span>\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Use the information in Table C.4. What is the average waiting time in line? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Less than or equal to 3.5 minutes<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Greater than 3.5 minutes but less than or equal to 4.5 minutes <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Greater than 4.5 minutes but less than or equal to 5.5 minutes <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Greater than 5.5 minutes <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>217.<span>\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Use the information in Table C.4. What is the average time spent in the system? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Less than or equal to 6.5 minutes <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Greater than 6.5 minutes but less than or equal to 7.5 minutes <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Greater than 7.5 minutes but less than or equal to 8.5 minutes <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Greater than 8.5 minutes <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<table>\n<tbody>\n<tr>\n<td width=\"581\">\n<table width=\"100%\">\n<tbody>\n<tr>\n<td>\n<div>\n<p><span>Table C.5<\/span><\/p>\n<p><span>A trucking firm has 5 trucks that each requires service at an average rate of once every 50 hours, according to an exponential distribution. The firm has a mechanic who needs 5 hours to complete the average job with exponential service times.<\/span><\/p>\n<\/div>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>\u00a0<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p>\u00a0<\/p>\n<p><span>218.<span>\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Use the information in Table C.5. What is the probability that there will be no trucks in the system? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Less than or equal to 0.50 <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Greater than 0.50 but less than or equal to 0.60 <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Greater than 0.60 but less than or equal to 0.70 <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Greater than 0.70 <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>219.<span>\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Use the information in Table C.5. What is the average utilization of the mechanic? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Less than or equal to 50% <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Greater than 50% but less than or equal to 60% <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Greater than 60% but less than or equal to 70% <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Greater than 70% <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>220.<span>\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Use the information in Table C.5. What is the average number of trucks waiting for service? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Less than or equal to 0.10 <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Greater than 0.10 but less than or equal to 0.14 <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Greater than 0.14 but less than or equal to 0.18 <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Greater than 0.18 <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>221.<span>\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Use the information in Table C.5. What is the average number of trucks in line waiting and being serviced? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Less than or equal to 0.30 trucks <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Greater than 0.30 trucks but less than or equal to 0.40 trucks <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Greater than 0.40 trucks but less than or equal to 0.50 trucks <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Greater than 0.50 trucks <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>222.<span>\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Use the information in Table C.5. What is the average waiting time of trucks in line? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Less than or equal to 1.5 hours <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Greater than 1.5 hours but less than or equal to 1.7 hours <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Greater than 1.7 hours bur less than or equal to 1.9 hours <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Greater than 1.9 hours <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>223.<span>\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Use the information in Table C.5. What is the average time that a truck spends in the system? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Less than or equal to 6.5 hours <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Greater than 6.5 hours but less than or equal to 7.0 hours <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Greater than 7.0 hours but less than or equal to 7.5 hours <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Greater than 7.5 hours <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<table>\n<tbody>\n<tr>\n<td width=\"587\">\n<table width=\"100%\">\n<tbody>\n<tr>\n<td>\n<div>\n<p><span>Table C.6<\/span><\/p>\n<p><span>The Jackson Machine Company has 4 cutting tools that need to be refurbished after an average of 30 hours, according to an exponential distribution. The machine that refurbishes the tools needs 15 hours for each tool on the average, with exponential service times.<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<\/div>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p>\u00a0<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p>\u00a0<\/p>\n<p><span>224.<span>\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Use the information in Table C.6. What is the probability that there will be no tools in the system? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Less than or equal to 0.09 <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Greater than 0.09 but less than or equal to 0.13 <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Greater than 0.13 but less than or equal to 0.17 <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Greater than 0.17 <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>225.<span>\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Use the information in Table C.6. What is the average utilization of the refurbishing machine? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Less than or equal to 40%? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Greater than 40% but less than or equal to 50% <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Greater than 50% but less than or equal to 60% <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Greater than 60% <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>226.<span>\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Use the information in Table C.6. What is the average number of tools waiting for service? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Less than or equal to 2.0 <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Greater than 2.0 but less than or equal to 2.5 <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Greater than 2.5 but less than or equal to 3.0 <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Greater than 3.0 <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>227.<span>\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Use the information in Table C.6. What is the average number of tools waiting in line and being serviced? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Less than or equal to 2.0 <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Greater than 2.0 but less than or equal to 2.5 <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Greater than 2.5 but less than or equal to 3.0 <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Greater than 3.0 <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>228.<span>\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Use the information in Table C.6. What is the average waiting time of tools in line? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Less than or equal to 15 hours <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Greater than 15 hours but less than or equal to 25 hours <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Greater than 25 hours but less than or equal to 35 hours <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Greater than 35 hours <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>229.<span>\u00a0\u00a0\u00a0\u00a0 <\/span><\/span><span>Use the information in Table C.6. What is the average time that a tool spends in the system? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Less than or equal to 20 hours <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Greater than 20 hours but less than or equal to 30 hours <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Greater than 30 hours but less than or equal to 40 hours <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Greater than 40 hours <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>230.\u00a0\u00a0 Which one of the following situations is more appropriate for the application of project management? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 When none of the tasks involved in the project can be done simultaneously.<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 The need for coordination among various functional areas is high.<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 The need for coordination among various functional areas is low.<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 The project is guaranteed to be successful.<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>231.\u00a0\u00a0 Before beginning to create a PERT\/CPM network model for a project, the project must be described in general terms. Two types of information that must be defined are <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 slack time and activities. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 manpower allocation and project due date.<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 crash times and manpower allocation.<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 activities and precedence relationships.<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>232.\u00a0\u00a0 In an activity-on-node (AON) network, the nodes represent __________ whereas the arcs represent __________.<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 activities; time<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 activities; precedence relationships<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 events; activities<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 precedence relationships; time <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>233.\u00a0\u00a0 In a network diagram, an \u201cactivity\u201d<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 is the largest unit of work effort consuming both time and resources that a project manager can schedule and control.<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 is the smallest unit of work effort consuming both time and resources that a project manager can schedule and control. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 should always be something the company has had experience with.<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 must always have a single, precise estimate for the time duration.<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>234.\u00a0\u00a0 Which one of the following statements about network diagrams is TRUE?<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 In an activity-on-node diagram, the nodes depict precedence relationships as well as activities.<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 In an activity-on-arc diagram, the arcs depict the activities as well as the precedence relationships.<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 In an activity-on-node diagram, \u201cevents\u201d are used to denote the end points of arcs.<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 In an activity-on-arc diagram, there is never a need to use \u201cdummy\u201d activities.<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>235.\u00a0\u00a0 Activity C cannot begin until both activities A and B have been completed. Activity D cannot begin until activity B has been completed. Which one of the following statements is TRUE?<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 A dummy activity is needed if the AOA approach is used.<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 The AOA approach cannot be used at all.<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 The AON approach would require more nodes than the AOA approach for these relationships.<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 The AON approach would require more arcs than the AOA approach for these relationships.<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>236.\u00a0\u00a0 A project has three paths. A-B-C has a length of 25 days. A-D-C has a length of 15 days. Finally, A-E-C has a length of 20 days. Which one of the following statements is TRUE?<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 A-D-C is the critical path.<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 A-B-C has the most slack.<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 The expected duration of this project is 25 days.<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 The expected duration of this project is 25 + 15 + 20 = 60 days.<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>237.\u00a0\u00a0 The earliest start time for an activity is equal to the <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 smallest earliest finish time of all of its immediate predecessors.<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 largest earliest finish time of all of its immediate predecessors.<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 smallest late start time of any of its immediate predecessors.<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 largest late finish time of all of its immediate predecessors.<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>238.\u00a0\u00a0 Assume that activity G has the following times:<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Early start time\u00a0\u00a0 = 7 days<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Early finish time = 13 days<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Late start time\u00a0\u00a0\u00a0\u00a0 = 15 days<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Late finish time\u00a0 = 21 days<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Which of the following statements is TRUE about activity G?<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Activity G takes 14 days to complete.<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Activity G has a slack time of 8 days.<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Activity G is on the critical path.<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Activity G takes 2 days to complete.<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>239.\u00a0\u00a0 Activity slack is defined as <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 latest start time minus earliest start time.<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 earliest start time minus latest start time.<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 earliest finish time minus latest finish time.<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 latest finish time minus earliest start time.<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>240.\u00a0\u00a0 Which one of the following best describes the critical path of a PERT\/CPM network?<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 The sequence of activities between a project\u2019s start and finish that takes the longest time to complete<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 The sequence of activities between a project\u2019s start and finish that has the maximum amount of activity slack<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 The set of activities that has no precedence relationships<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 The sequence of activities that has the lowest normal activity cost<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>241.\u00a0\u00a0 When using the beta probability distribution to estimate activity times, which of the following statements is TRUE?<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 The project manager is usually the only person involved in making time estimates, as obtaining estimates from workers involved in the activities would result in inconsistent estimates.<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 The beta distribution is used as a way of approximating a normal probability distribution for time estimates.<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 The use of most optimistic, most likely, and most pessimistic times for an activity will result in a determination of the expected times for that activity.<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 The larger the difference between most pessimistic time and most optimistic time for an activity, the smaller will be the variance of that time estimate.<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>242.\u00a0\u00a0 When using the beta distribution for estimating activity times, <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 an advantage is that the mode of the distribution is always equidistant from the end points of the distribution.<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 the most likely time estimate can be positioned anywhere between the optimistic and pessimistic time estimates.<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 we assume that the standard deviation is one-third the range between the optimistic and pessimistic time estimates.<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 the most likely time estimate becomes the mean of the distribution.<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>243.\u00a0\u00a0 Following are four sets of most optimistic, most likely, and most pessimistic times (in weeks) for an activity. Which one of the four sets will have a mean estimated time equal to the most likely time? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 1, 9, 9<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 1, 5, 9<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 1, 1, 9<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 1, 5, 5<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>244.\u00a0\u00a0 To calculate the probability of completing a project by a certain date,<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 the expected completion time of the project is taken to be the sum of the activity times on the shortest path.<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 the variance of the distribution of project completion times is taken to be one-sixth the difference between the latest finish time and the earliest finish time of the last activity in the project.<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 we assume that the activity durations are independent of each other so that the normal distribution can be used. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 we only need the parameters of the beta distribution for the finish node of the diagram.<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>245.\u00a0\u00a0 If a project has multiple critical paths, which of the following variances should be used in analyzing project completion time probabilities?<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 The critical path with the smallest variance<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 The critical path with the largest variance<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 The sum of the variances for all critical paths<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 The average variance of the critical paths<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>246.\u00a0\u00a0 Which one of the following statements concerning project costs is TRUE?<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 The direct costs for the critical path will always be higher than for any other path.<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 The direct costs for the critical path will always be lower than for any other path.<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Penalty costs are incurred when a project is crashed, thus reducing total project time.<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Indirect costs can get smaller as the total project time is reduced. <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>247.\u00a0\u00a0 Crash time is best defined as<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 the time needed to complete the shortest activity in a network.<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 the shortest time needed to complete a particular activity.<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 the difference between the late start time and the early start time.<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 the amount of slack for a particular activity.<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>248.\u00a0\u00a0 Which one of the following statements concerning cost considerations in project management is TRUE?<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 The minimum-cost schedule may include activities that have been crashed at additional expense.<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 The best schedule will be the one that finishes the project in the least amount of time. <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 If the minimum-cost schedule is determined correctly, there will never be more than one critical path.<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 The minimum-cost schedule will never incur penalty costs.<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>249.\u00a0\u00a0 If a project has exactly one critical path, which one of the following statements is TRUE?<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Crashing an activity on the critical path will always result in an increase in total project profits.<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Activities on the critical path cannot be crashed.<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Crashing an activity on the critical path will always result in a reduced total project completion time.<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 The best schedule is one in which all activities are crashed as much as possible.<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>250.\u00a0\u00a0 Which one of the following conditions violates the assumptions of PERT\/CPM networks?<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Some activities can have zero variance.<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Costs increase linearly as activity time is reduced below its normal time.<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Two activities tied together by an arc are overlapping and can be worked on simultaneously.<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 There can be more than one critical path in a network.<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>251.\u00a0\u00a0 Which one of the following statements is TRUE? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 The path in a network having the minimum slack is the shortest path in the network.<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 There is never more than one critical path in a network.<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Crashing an activity on the critical path will always result in an increase in total project profits.<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 PERT\/CPM assumes that two activities tied together by a precedence relationship cannot be worked on simultaneously.<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>252.\u00a0\u00a0 In making an estimate of the most pessimistic time for an activity, a manager deliberately estimates this time too high (i.e., longer than it should be). What is the result of this action, assuming the beta distribution is being used to make time estimates?<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 The most likely time for this activity will be larger than it should be.<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 The variance of the activity will be smaller than it should be.<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 The beta distribution will be symmetric around its mean.<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 The expected time for this activity will be larger than it should be.<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>Table 4.1<\/span><\/p>\n<p><span><img loading=\"lazy\" decoding=\"async\" src=\"\" alt=\"\" width=\"334\" height=\"233\"\/><\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>253.\u00a0\u00a0 Using Table 4.1, what is the earliest expected time of completion of the whole project?<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Less than or equal to 19 weeks<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Greater than 19 but less than or equal to 21 weeks<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Greater than 21 but less than or equal to 24 weeks<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Greater than 24 weeks <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>254.\u00a0\u00a0 Using Table 4.1, which activity will have the largest amount of slack?<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Activity F<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Activity C<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Activity H<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Activity A<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>255.\u00a0\u00a0 Using Table 4.1, if the expected times for activities A, G, and H increased by 2, 3, and 4 weeks, respectively, by how many weeks would the project\u2019s earliest expected time of completion increase?<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Less than or equal to 2 weeks<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Greater than 2 weeks but less than or equal to 4 weeks<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Greater than 4 weeks but less than or equal to 6 weeks<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Greater than 6 weeks<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>Table 4.2<\/span><\/p>\n<table border=\"1\">\n<tbody>\n<tr>\n<td valign=\"top\" width=\"60\">\n<p><span>\u00a0<\/span><\/p>\n<\/td>\n<td valign=\"top\" width=\"108\">\n<p><span>\u00a0<\/span><\/p>\n<\/td>\n<td valign=\"top\" width=\"73\">\n<p><span>\u00a0<\/span><\/p>\n<\/td>\n<td colspan=\"2\" valign=\"top\" width=\"131\">\n<p><span>Time (weeks)<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\" width=\"60\">\n<p><span>Activity<\/span><\/p>\n<\/td>\n<td valign=\"top\" width=\"108\">\n<p><span>Immediate Predecessor(s)<\/span><\/p>\n<\/td>\n<td valign=\"top\" width=\"73\">\n<p><span>Most<\/span><\/p>\n<p><span>Optimistic<\/span><\/p>\n<\/td>\n<td valign=\"top\" width=\"49\">\n<p><span>Most<\/span><\/p>\n<p><span>Likely<\/span><\/p>\n<\/td>\n<td valign=\"top\" width=\"83\">\n<p><span>Most<\/span><\/p>\n<p><span>Pessimistic<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\" width=\"60\">\n<p><span>A<\/span><\/p>\n<\/td>\n<td valign=\"top\" width=\"108\">\n<p><span>&#8212;<\/span><\/p>\n<\/td>\n<td valign=\"top\" width=\"73\">\n<p><span>2<\/span><\/p>\n<\/td>\n<td valign=\"top\" width=\"49\">\n<p><span>4<\/span><\/p>\n<\/td>\n<td valign=\"top\" width=\"83\">\n<p><span>6<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\" width=\"60\">\n<p><span>B<\/span><\/p>\n<\/td>\n<td valign=\"top\" width=\"108\">\n<p><span>&#8212;<\/span><\/p>\n<\/td>\n<td valign=\"top\" width=\"73\">\n<p><span>1<\/span><\/p>\n<\/td>\n<td valign=\"top\" width=\"49\">\n<p><span>4<\/span><\/p>\n<\/td>\n<td valign=\"top\" width=\"83\">\n<p><span>7<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\" width=\"60\">\n<p><span>C<\/span><\/p>\n<\/td>\n<td valign=\"top\" width=\"108\">\n<p><span>A<\/span><\/p>\n<\/td>\n<td valign=\"top\" width=\"73\">\n<p><span>2<\/span><\/p>\n<\/td>\n<td valign=\"top\" width=\"49\">\n<p><span>2<\/span><\/p>\n<\/td>\n<td valign=\"top\" width=\"83\">\n<p><span>2<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\" width=\"60\">\n<p><span>D<\/span><\/p>\n<\/td>\n<td valign=\"top\" width=\"108\">\n<p><span>B<\/span><\/p>\n<\/td>\n<td valign=\"top\" width=\"73\">\n<p><span>1<\/span><\/p>\n<\/td>\n<td valign=\"top\" width=\"49\">\n<p><span>7<\/span><\/p>\n<\/td>\n<td valign=\"top\" width=\"83\">\n<p><span>10<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\" width=\"60\">\n<p><span>E<\/span><\/p>\n<\/td>\n<td valign=\"top\" width=\"108\">\n<p><span>D<\/span><\/p>\n<\/td>\n<td valign=\"top\" width=\"73\">\n<p><span>2<\/span><\/p>\n<\/td>\n<td valign=\"top\" width=\"49\">\n<p><span>4<\/span><\/p>\n<\/td>\n<td valign=\"top\" width=\"83\">\n<p><span>6<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\" width=\"60\">\n<p><span>F<\/span><\/p>\n<\/td>\n<td valign=\"top\" width=\"108\">\n<p><span>E<\/span><\/p>\n<\/td>\n<td valign=\"top\" width=\"73\">\n<p><span>1<\/span><\/p>\n<\/td>\n<td valign=\"top\" width=\"49\">\n<p><span>2<\/span><\/p>\n<\/td>\n<td valign=\"top\" width=\"83\">\n<p><span>3<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\" width=\"60\">\n<p><span>G<\/span><\/p>\n<\/td>\n<td valign=\"top\" width=\"108\">\n<p><span>C<\/span><\/p>\n<\/td>\n<td valign=\"top\" width=\"73\">\n<p><span>3<\/span><\/p>\n<\/td>\n<td valign=\"top\" width=\"49\">\n<p><span>4<\/span><\/p>\n<\/td>\n<td valign=\"top\" width=\"83\">\n<p><span>17<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\" width=\"60\">\n<p><span>H<\/span><\/p>\n<\/td>\n<td valign=\"top\" width=\"108\">\n<p><span>D,G<\/span><\/p>\n<\/td>\n<td valign=\"top\" width=\"73\">\n<p><span>3<\/span><\/p>\n<\/td>\n<td valign=\"top\" width=\"49\">\n<p><span>7<\/span><\/p>\n<\/td>\n<td valign=\"top\" width=\"83\">\n<p><span>11<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\" width=\"60\">\n<p><span>I<\/span><\/p>\n<\/td>\n<td valign=\"top\" width=\"108\">\n<p><span>D<\/span><\/p>\n<\/td>\n<td valign=\"top\" width=\"73\">\n<p><span>8<\/span><\/p>\n<\/td>\n<td valign=\"top\" width=\"49\">\n<p><span>9<\/span><\/p>\n<\/td>\n<td valign=\"top\" width=\"83\">\n<p><span>10<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\" width=\"60\">\n<p><span>J<\/span><\/p>\n<\/td>\n<td valign=\"top\" width=\"108\">\n<p><span>F,H<\/span><\/p>\n<\/td>\n<td valign=\"top\" width=\"73\">\n<p><span>4<\/span><\/p>\n<\/td>\n<td valign=\"top\" width=\"49\">\n<p><span>5<\/span><\/p>\n<\/td>\n<td valign=\"top\" width=\"83\">\n<p><span>6<\/span><\/p>\n<\/td>\n<\/tr>\n<tr>\n<td valign=\"top\" width=\"60\">\n<p><span>K<\/span><\/p>\n<\/td>\n<td valign=\"top\" width=\"108\">\n<p><span>I<\/span><\/p>\n<\/td>\n<td valign=\"top\" width=\"73\">\n<p><span>1<\/span><\/p>\n<\/td>\n<td valign=\"top\" width=\"49\">\n<p><span>1<\/span><\/p>\n<\/td>\n<td valign=\"top\" width=\"83\">\n<p><span>1<\/span><\/p>\n<\/td>\n<\/tr>\n<\/tbody>\n<\/table>\n<p><span>\u00a0<\/span><\/p>\n<p><span>256.\u00a0\u00a0 Using Table 4.2, what is the earliest expected time of completion of the whole project? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Less than or equal to 21 days<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Greater than 21 but less than or equal to 22 days<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Greater than 22 but less than or equal to 23 days<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Greater than 23 days<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>257.\u00a0\u00a0 Using Table 4.2, which activity is on the critical path?<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Activity D<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Activity F<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Activity G<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Activity K <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>258.\u00a0\u00a0 Using Table 4.2, if the project is due to be completed in 28 days, what is the probability that the project will be completed on or before the due date?<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Less than or equal to 75%<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Greater than 75% but less than or equal to 85%<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Greater than 85% but less than or equal to 95%<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Greater than 95%<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>259.\u00a0\u00a0 If the project manager wants at least a 98% probability that the project will be completed on or before the due date, what is the shortest project due date that will satisfy the manager? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 less than or equal to 28 days<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 greater than 28 days but less than or equal to 30 days<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 greater than 30 days but less than or equal to 32 days<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 greater than 32 days<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>Table 4.3<\/span><\/p>\n<p><span><img loading=\"lazy\" decoding=\"async\" src=\"\" alt=\"\" width=\"213\" height=\"220\"\/><\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>260.\u00a0\u00a0 Using Table 4.3, what is the earliest completion time for this project?<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 9 weeks<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 12 weeks<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 15 weeks<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 None of the above<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>261.\u00a0\u00a0 Using Table 4.3, what is the largest amount of slack that any activity in the project has?<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 0 weeks<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 1 week<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 2 weeks<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 3 or more weeks<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>262.\u00a0\u00a0 Using Table 4.3, what is the minimum number of activities that would have to be delayed in order to cause an increase in the project\u2019s earliest completion date?<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 1 activity<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 2 activities<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 3 activities<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 4 or more activities<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>263.\u00a0\u00a0 Using Table 4.3, what is the minimum number of activities that would have to be crashed in order to cause a decrease in the project\u2019s earliest completion date?<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 1 activity<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 2 activities<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 3 activities<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 4 or more activities<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>Table 4.4<\/span><\/p>\n<p><span><img loading=\"lazy\" decoding=\"async\" src=\"\" alt=\"\" width=\"213\" height=\"315\"\/><\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>264.\u00a0\u00a0 Using Table 4.4, the expected time to complete the whole project is<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 less than 12 days.<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 12 days.<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 14 days.<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 more than 14 days.<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>265.\u00a0\u00a0 Using Table 4.4, what is the latest finish time for activity D? <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 4 days<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 6 days<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 8 days<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 10 days <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>266.\u00a0\u00a0 Using Table 4.4, of the following activities, which one has a slack value greater than zero days?<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Activity B<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Activity C<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Activity K<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Activity N <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>Table 4.5 <\/span><\/p>\n<p><span><img loading=\"lazy\" decoding=\"async\" src=\"\" alt=\"\" width=\"180\" height=\"150\"\/><\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>267.\u00a0\u00a0 Using Table 4.5, what is the earliest completion time of this project?<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Less than or equal to 12 weeks<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Greater than 12 weeks but less than or equal to 14 weeks<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Greater than 14 weeks but less than or equal to 16 weeks<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Greater than 16 weeks<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>268.\u00a0\u00a0 Using Table 4.5, what is the critical path of this project?<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 A-C-G<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 B-C-G<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 A-C-E-F<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 A-D-F<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>269.\u00a0\u00a0 Using Table 4.5, how many weeks can activity B be delayed without changing the whole project\u2019s earliest completion time?<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 0 weeks<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 1 week<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 2 weeks<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 3 weeks<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>Table 4.6<\/span><\/p>\n<p><span><img loading=\"lazy\" decoding=\"async\" src=\"\" alt=\"\" width=\"178\" height=\"180\"\/><\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>270.\u00a0\u00a0 Using Table 4.6, what is the earliest completion time of the project?<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Less than or equal to 25 weeks<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Greater than 25 weeks but less than or equal to 30 weeks<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Greater than 30 weeks but less than or equal to 35 weeks<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Greater than 35 weeks<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>271.\u00a0\u00a0 Using Table 4.6, what is the slack for activity G?<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 9 weeks<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 21 weeks<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 23 weeks<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 30 weeks<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>Table 4.7<\/span><\/p>\n<p><span><img loading=\"lazy\" decoding=\"async\" src=\"\" alt=\"\" width=\"201\" height=\"257\"\/><\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>272.\u00a0\u00a0 Using Table 4.7, what is the critical path for this project?<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 B-E-H-K<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 B-E-H-J<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 A-E-G-J<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 C-F-I-L<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>273.\u00a0\u00a0 Using Table 4.7, suppose activity D can be shortened from 4 days to 1 day. Assume all other activity times remain the same. How much shorter will the total project earliest completion time become?<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 0 days<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 1 day<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 2 days<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 3 days <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>274.\u00a0\u00a0 Using Table 4.7, suppose activity I is delayed, taking 8 days to complete instead of 2 days. Assume all other activity times remain the same. How much longer will the total project earliest completion time become?<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 0 days<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 1 or 2 days<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 3 or 4 days<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 5 or 6 days <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>275.\u00a0\u00a0 Using Table 4.7, what is the latest start time for activity A?<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Day 0<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Day 1<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Day 2<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Day 3 or later<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>Table 4.8<\/span><\/p>\n<p><span><img loading=\"lazy\" decoding=\"async\" src=\"\" alt=\"\" width=\"213\" height=\"164\"\/><\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>276.\u00a0\u00a0 Using Table 4.8, what is the earliest completion time of the project?<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Less than or equal to 10 weeks<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Greater than 10 weeks but less than or equal to 13 weeks<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Greater than 13 weeks but less than or equal to 16 weeks<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Greater than 16 weeks <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>277.\u00a0\u00a0 Using Table 4.8, what is the critical path of the above project?<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 B-C-E-F<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 B-C-F<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 A-D-F<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 A-C-E-F<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>278.\u00a0\u00a0 Using Table 4.8, what is the slack for activity A?<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 0 weeks<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 1 week<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 2 weeks<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 3 or more weeks<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>Table 4.9<\/span><\/p>\n<p><span><img loading=\"lazy\" decoding=\"async\" src=\"\" alt=\"\" width=\"299\" height=\"164\"\/><\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>279.\u00a0\u00a0 Using Table 4.9, what is the critical path for this project?<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 A-C-F<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 A-E<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 B-F<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 B-D-E <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>280.\u00a0\u00a0 Using Table 4.9, what is the latest finish time of activity B?<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 1 week<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 2 weeks<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 3 weeks<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 4 or more weeks<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>281.\u00a0\u00a0 Using Table 4.9, if the project must be completed in 10 weeks, and assuming all activities (except C) are available to be crashed, which one of the following actions should be taken?<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Crash activity B by 1 week<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Crash activity D by 1 week<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Crash activity A by 1 week<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Crash activity F by 1 week <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>282.\u00a0\u00a0 Using Table 4.9, if the project must be completed in 9 weeks, and assuming all activities (except C) are available to be crashed, which one of the following actions is most appropriate?<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Crash activity B by 2 weeks<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Crash activity E by 2 weeks<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Crash activity E by 1 week and activity B by 1 week<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Crash activity D by 2 weeks<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>Table 4.10<\/span><\/p>\n<p><span><img loading=\"lazy\" decoding=\"async\" src=\"\" alt=\"\" width=\"299\" height=\"272\"\/><\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>283.\u00a0\u00a0 Using Table 4.10, what is the earliest completion time of this project?<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Less than 11 weeks<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 11 weeks<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 12 weeks<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 More than 12 weeks<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>284.\u00a0\u00a0 Using Table 4.10, if activity B is crashed by 2 weeks, what is the new earliest completion time of the project?<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Less than 11 weeks<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 11 weeks <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 12 weeks<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 More than 12 weeks <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>285.\u00a0\u00a0 Using Table 4.10, and assuming all activities except D, F, H, and K are available to be crashed, what is the minimum cost to be incurred in reducing the total project earliest completion time by 1 week?<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 $3,000<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 $6,000<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 $8,000<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 $10,000<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>Table 4.11<\/span><\/p>\n<p><span><img loading=\"lazy\" decoding=\"async\" src=\"\" alt=\"\" width=\"334\" height=\"246\"\/><\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>286.\u00a0\u00a0 Using Table 4.11, what is the earliest completion time of this project if normal times are used for all activities?<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Less than 13 weeks<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 13 weeks<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 14 weeks<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 More than 14 weeks<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>287.\u00a0\u00a0 Using Table 4.11, what is the minimum time schedule for this project?<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Less than 8 weeks<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 8 weeks<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 9 weeks<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 More than 9 weeks<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>288.\u00a0\u00a0 Using Table 4.11, if the project completion time has to be reduced by 1 week, which of the following activities should be crashed in order to minimize the extra cost of earlier completion?<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Activity B<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Activity E<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Activity H<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Activity J<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>289.\u00a0\u00a0 Using Table 4.11, what is the difference, in dollars, between the minimum-time schedule and the schedule created by crashing all activities to their limits? Assume that there are no indirect or penalty costs.<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Less than or equal to $1000<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Greater than $1000 but less than or equal to $2000<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Greater than $2000 but less than or equal to $3000<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Greater than $3000 <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>290.\u00a0\u00a0 Using Table 4.11, if the project\u2019s normal earliest completion time is to be reduced by 2 weeks, what is the minimum additional cost that will be incurred in achieving this 2-week reduction?<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Less than or equal to $1000<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Greater than $1000 but less than or equal to $1500<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Greater than $1500 but less than or equal to $2000<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Greater than $2000<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Table 4.12<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 All activity times for the project are in weeks.<\/span><\/p>\n<p><span><img loading=\"lazy\" decoding=\"async\" src=\"\" alt=\"\" width=\"346\" height=\"177\"\/><\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>291.\u00a0\u00a0 Using Table 4.12, what is the critical path of this project?<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 A-C-F-H<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 B-D-F-H<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 B-D-G<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 B-E-G<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>292.\u00a0\u00a0 Using Table 4.12, what is the expected time of completion of the project?<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Less than 22 weeks<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 22 weeks<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 23 weeks<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Greater than 23 weeks<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>293.\u00a0\u00a0 Using Table 4.12, what is the probability that the project will be completed in 24 weeks or less?<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Less than or equal to 55%<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Greater than 55% but less than or equal to 65%<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Greater than 65% but less than or equal to 75%<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Greater than 75%<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>294.\u00a0\u00a0 Using Table 4.12, if the expected time for activity E is changed to 9 weeks, by how many weeks will the project\u2019s expected completion time increase?<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 It will not change.<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 It will increase by 1 week.<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 It will increase by 2 weeks.<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 It will increase by 3 or more weeks.<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Table 4.13<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 You are responsible for managing a project with the following activities (times are given in weeks).<\/span><\/p>\n<p><span><img loading=\"lazy\" decoding=\"async\" src=\"\" alt=\"\" width=\"346\" height=\"135\"\/><\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>295.\u00a0\u00a0 Using Table 4.13, what is the critical path and expected completion time for this project?<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 A-D-E; 17 weeks<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 A-C; 18 weeks<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 B-E; 14 weeks<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 A-D-E; 18 weeks<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>296.\u00a0\u00a0 Using Table 4.13, which activity has the largest slack, and how large is that slack?<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Activity C; 5 weeks<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Activity A; 6 weeks<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Activity B; 4 weeks<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Activity E; 3 weeks <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>297.\u00a0\u00a0 Using Table 4.13, what is the probability of completing the project in 17 weeks or less?<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Less than or equal to 40%<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Greater than 40% but less than or equal to 55%<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Greater than 55% but less than or equal to 70%<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Greater than 70%<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>298.\u00a0\u00a0 Using Table 4.13, what is the probability that the project will take 16 or more weeks to complete?<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Less than or equal to 40%<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Greater than 40% but less than or equal to 55%<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Greater than 55% but less than or equal to 70%<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Greater than 70%<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>299.\u00a0\u00a0 Using Table 4.13, if the expected time for activity B is changed to 18 weeks, by how many weeks will the project\u2019s expected completion time increase?<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 It will not change.<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 It will increase by 1 or 2 weeks.<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 It will increase by 3 or 4 weeks.<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 It will increase by more than 4 weeks.<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>Table 4.14<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 You are responsible for managing a project with the following activities (times are given in days).<\/span><\/p>\n<p><span><img loading=\"lazy\" decoding=\"async\" src=\"\" alt=\"\" width=\"248\" height=\"173\"\/><\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>300.\u00a0\u00a0 Using, Table 4.14, what is the critical path and expected completion time for this project?<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 A-F; 12 days<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 A-D-G; 12 days<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 B-G; 10 days<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 C-E-G; 8 days<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>301.\u00a0\u00a0 Using, Table 4.14, which of the following activities has the largest amount of slack?<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Activity B<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Activity D<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Activity E<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Activity F<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Table 4.15<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 You are responsible for managing a project with the following activities (times are given in weeks).<\/span><\/p>\n<p><span><img loading=\"lazy\" decoding=\"async\" src=\"\" alt=\"\" width=\"253\" height=\"186\"\/><\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>302.\u00a0\u00a0 Using Table 4.15, what is the critical path for this network?<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 A-C-F-H<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 A-D-F-H<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 B-D-G-H<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 B-E-G-H<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>303.\u00a0\u00a0 Using Table 4.15, which of the following activities has the largest amount of slack?<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Activity C<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Activity D<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Activity E<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Activity H<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>304.\u00a0\u00a0 Using Table 4.15, if the expected time for activity D is increased to 6 weeks, by how many weeks will the project\u2019s expected completion time increase?<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 It will not increase.<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 It will increase by 1 week.<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 It will increase by 2 weeks.<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 It will increase by more than 2 weeks.<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Table 4.16<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 You are responsible for managing a project with the following activities (times are given in weeks).<\/span><\/p>\n<p><span><img loading=\"lazy\" decoding=\"async\" src=\"\" alt=\"\" width=\"253\" height=\"186\"\/><\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>305.\u00a0\u00a0 Using Table 4.16, what are the critical path and the expected completion time for this project?<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 A-C-E-G; 33 weeks<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 B-D-F-G; 33 weeks<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 B-C-E-G; 35 weeks<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 B-C-F-H; 34 weeks<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>306.\u00a0\u00a0 Using Table 4.16, if the expected time for activity E is decreased to 8 weeks, what is the new expected completion time for the project?<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 31 weeks or less<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 32-33 weeks<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 34-35 weeks<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 More than 35 weeks<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>307.\u00a0\u00a0 Assuming a beta distribution is being used, if the most optimistic time for an activity decreases by 12 days, what will happen to the expected time for that activity?<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 It will increase by 2 days.<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 It will decrease by 2 days.<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 It will decrease by 12 days.<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 It will remain the same.<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>308.\u00a0\u00a0 Assuming a beta distribution is being used, if the most pessimistic time for an activity increases by 6 weeks, what will happen to the expected time for that activity?<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 It will increase by 1 week<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 It will decrease by 1 week.<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 It will increase by 6 weeks.<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 It will remain the same.<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>309.\u00a0\u00a0 The probability that a project will be completed by its earliest expected completion date is<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 50 percent.<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 95 percent.<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 100 percent.<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 impossible to determine.<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>310.\u00a0\u00a0 If the sum of the variances on the critical path (and all other network paths) is equal to zero, what is the probability that the project will be completed by its earliest expected completion date?<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 50 percent<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 95 percent<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 100 percent<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 It cannot be determined.<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>311.\u00a0\u00a0 A project is currently scheduled to be finished on its normal earliest completion date. The project manager has the opportunity to earn a bonus if the project can be completed three weeks ahead of schedule. The increase in project direct costs related to crashing activities would be $40,000. Also, project indirect costs are $15,000 per week. What is the smallest bonus that the project manager should accept if he or she wants to avoid increasing overall project costs.<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Less than or equal to $5000<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Greater than $5000 but less than or equal to $10,000<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Greater than $10,000 but less than or equal to $15,000<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Greater than $15,000 <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>312.\u00a0\u00a0 You are given the following information about activity A:<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Normal time\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 = 9 weeks<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Crash time\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 = 7 weeks<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Normal cost\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 = $20,000<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Crash cost\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 = $30,000<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 What will it cost to complete activity A in 8 weeks?<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Less than or equal to $24,000<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Greater than $24,000 but less than or equal to $27,000 <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Greater than $27,000 but less than or equal to $30,000 <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Greater than $30,000 <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>313.\u00a0\u00a0 You are given the following information about activity B:<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Normal time\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 = 9 weeks<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Crash time\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 = 5 weeks<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Cost to crash per week\u00a0\u00a0 = $2000<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Crash cost\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 = $41,000<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 What will it cost to complete activity B in 6 weeks?<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Less than or equal to $34,000 <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Greater than $34,000 but less than or equal to $36,000<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Greater than $36,000 but less than or equal to $38,000<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Greater than $38,000 <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>314.\u00a0\u00a0 You are given the following information about activity F:<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Normal time\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 = 16 weeks<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Crash time\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 = 10 weeks<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Crash cost\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 = $45,000<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 Cost to crash per week\u00a0\u00a0 = $2,000<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 What is the normal cost for activity F?<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Greater than or equal to $55,000 <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Less than $55,000 but greater than or equal to $47,000<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Less than $47,000 but greater than or equal to $40,000<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Less than $40,000<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 <span>Table 4.17<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span><img loading=\"lazy\" decoding=\"async\" src=\"\" alt=\"\" width=\"334\" height=\"186\"\/><\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>Indirect costs are $10,000 per week, and a penalty cost of $10,000 per week will be incurred for every week past week 9 until the project is completed.<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>315.\u00a0\u00a0 Using Table 4.17, what is the shortest time duration for this project?<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Less than 8 weeks <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 8 weeks <\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 9 weeks<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 More than 9 weeks <\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>316.\u00a0\u00a0 Using Table 4.17, what is the total cost associated with completing the project in 12 weeks?<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Less than or equal to $160,000<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Greater than $160,000 but less than or equal to $200,000<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Greater than $200,000 but less than or equal to $240,000<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Greater than $240,000<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>317.\u00a0\u00a0 Using Table 4.17, what will be the total time of the minimum-cost schedule?<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 8 weeks or less<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 9 weeks<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 10 weeks<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 11 weeks or more<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>318.\u00a0\u00a0 A company could add $10,000 per week in revenues if the project depicted in Table 4.18 could be shortened.<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>Table 4.18<\/span><\/p>\n<p><span><img loading=\"lazy\" decoding=\"async\" src=\"\" alt=\"\" width=\"219\" height=\"216\"\/><\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>There exist four possible options to crash activities: crash A by one week at a cost of $6000; crash C by two weeks at a cost of $15,000; crash E by one week at a cost of $2000; and crash I one week at a cost of $7000. What is the maximum amount of additional profit that can be made by crashing an option (or options)?<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Less than or equal to $4000<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Greater than $4000 but less than or equal to $8000<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Greater than $8000 but less than or equal to $12,000<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Greater than $12,000<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>Table 4.19<\/span><\/p>\n<p><span><img loading=\"lazy\" decoding=\"async\" src=\"\" alt=\"\" width=\"334\" height=\"181\"\/><\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>319.\u00a0\u00a0 Using Table 4.19, what is the minimum-time schedule for this project?<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Less than or equal to 8 weeks<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Greater than 8 but less than or equal to 10 weeks<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Greater than 10 but less than or equal to 12 weeks<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Greater than 12 weeks<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>320.\u00a0\u00a0 Using Table 4.19, what is the difference, in dollars, between the minimum-time schedule and the schedule created by crashing all activities to their limits? Assume that there are no indirect or penalty costs.<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Less than or equal to $2000<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Greater than $2000 but less than or equal to $3000<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Greater than $3000 but less than or equal to $4000<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Greater than $4000<\/span><\/p>\n<p><span>\u00a0<\/span><\/p>\n<p><span>321.\u00a0\u00a0 Using Table 4.19, if indirect costs are $3000 per week and penalty costs are $0, what would be the difference in total project costs between the normal earliest completion time schedule and the minimum-time schedule?<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 Less than or equal to $5000<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 Greater than $5000 but less than or equal to $10,000<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c.\u00a0 Greater than $10,000 but less than or equal to $15,000<\/span><\/p>\n<p><span>\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 d.\u00a0 Greater than $15,000<\/span><\/p>\n<p><a rel=\"nofollow noopener\" target=\"_blank\" name=\"_GoBack\"><span>\u00a0<\/span><\/p>\n<p>\u00a0<\/p>\n<p>\u00a0<\/p>\n<p>\u00a0<\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>1.\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 The basic purpose of supply chain management is to \u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 a.\u00a0 create an exclusive set of suppliers who will not supply your competitors. \u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 b.\u00a0 link your customers together so that the flow of materials remains under control. \u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0\u00a0 c. synchronize the operations of all suppliers with those of purchasing, production, distribution, and customers. [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[16],"tags":[],"class_list":["post-23799","post","type-post","status-publish","format-standard","hentry","category-education"],"_links":{"self":[{"href":"https:\/\/assignmenttutors.net\/blog\/wp-json\/wp\/v2\/posts\/23799","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/assignmenttutors.net\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/assignmenttutors.net\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/assignmenttutors.net\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/assignmenttutors.net\/blog\/wp-json\/wp\/v2\/comments?post=23799"}],"version-history":[{"count":0,"href":"https:\/\/assignmenttutors.net\/blog\/wp-json\/wp\/v2\/posts\/23799\/revisions"}],"wp:attachment":[{"href":"https:\/\/assignmenttutors.net\/blog\/wp-json\/wp\/v2\/media?parent=23799"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/assignmenttutors.net\/blog\/wp-json\/wp\/v2\/categories?post=23799"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/assignmenttutors.net\/blog\/wp-json\/wp\/v2\/tags?post=23799"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}