{"id":19707,"date":"2021-12-02T03:53:29","date_gmt":"2021-12-02T03:53:29","guid":{"rendered":"https:\/\/assignmenttutors.net\/blog\/510-unit-8-project-management-harrisburg-university-of-science-and-technology\/"},"modified":"2021-12-02T03:53:29","modified_gmt":"2021-12-02T03:53:29","slug":"510-unit-8-project-management-harrisburg-university-of-science-and-technology","status":"publish","type":"post","link":"https:\/\/assignmenttutors.net\/blog\/510-unit-8-project-management-harrisburg-university-of-science-and-technology\/","title":{"rendered":"510 unit 8 | project management | Harrisburg University of Science and Technology"},"content":{"rendered":"<div>\n<p>\u00a0<\/p>\n<p>There are 2 parts to this assignment.\u00a0 You can submit two files to the drop box.\u00a0 MS Project (should you have your own license to the software) is not acceptable for completing any part of this assignment.<\/p>\n<p><strong>Part 1 Exercise Questions<\/strong> (40 points)<\/p>\n<p>Complete exercise questions 1 (5 pts), 3 (5 pts), 5 (10 pts), 6 (5 pts) and 9 (15 pts) found at the end of Chapter 8.<\/p>\n<p>\u00a0<\/p>\n<p><strong>Part 2 Scheduling Problem<\/strong> (50 points)<\/p>\n<p>Complete the following:<\/p>\n<p>Your child is a member of the school theater group and have been asked to prepare the schedule, etc. for a skit to be performed during the 4th of July celebration in the local village square.\u00a0 As a volunteer, you offer to serve as the project controller because of your expertise in schedule management.<\/p>\n<ol>\n<li>Construct an AON diagram similar to the format used in the Youtube videos found in the commentary using an MS Excel spreadsheet.\u00a0 Ensure that you include a Start activity and a Finish activity.\u00a0 Include a legend (example is the one completed in Question 1, Part 1.<\/li>\n<li>Calculate the estimated time for each activity using PERT techniques for the 3 estimates provided.\u00a0 Include a sample calculation.<\/li>\n<li>Prepare a table that identifies all paths and their lengths.\u00a0 Which path is the critical path?<\/li>\n<li>During the execution phase of the skit project, one of the activities on the critical path is delayed by one day.\u00a0 Is this serious?<\/li>\n<li>Using the activity estimates for optimistic, pessimistic and most likely time to complete activities on the critical path, qualitatively discuss the estimate uncertainty of the critical path.\u00a0\u00a0<\/li>\n<li><\/li>\n<li><\/li>\n<\/ol>\n<p>\u00a0<\/p>\n<p>Activity<\/p>\n<p>Predecessor<\/p>\n<p>Time (days)<\/p>\n<p>Optimistic<\/p>\n<p>Most Likely<\/p>\n<p>Pessimistic<\/p>\n<p>1<\/p>\n<p>None<\/p>\n<p>2<\/p>\n<p>4<\/p>\n<p>6<\/p>\n<p>2<\/p>\n<p>None<\/p>\n<p>5<\/p>\n<p>5<\/p>\n<p>5<\/p>\n<p>3<\/p>\n<p>2<\/p>\n<p>3<\/p>\n<p>5<\/p>\n<p>7<\/p>\n<p>4<\/p>\n<p>1<\/p>\n<p>7<\/p>\n<p>10<\/p>\n<p>13<\/p>\n<p>5<\/p>\n<p>1<\/p>\n<p>11<\/p>\n<p>12<\/p>\n<p>13<\/p>\n<p>6<\/p>\n<p>2,4<\/p>\n<p>5<\/p>\n<p>6<\/p>\n<p>7<\/p>\n<p>7<\/p>\n<p>3<\/p>\n<p>9<\/p>\n<p>10<\/p>\n<p>11<\/p>\n<p>8<\/p>\n<p>3,6<\/p>\n<p>5<\/p>\n<p>7<\/p>\n<p>9<\/p>\n<p>9<\/p>\n<p>4<\/p>\n<p>7<\/p>\n<p>9<\/p>\n<p>11<\/p>\n<p>10<\/p>\n<p>5<\/p>\n<p>3<\/p>\n<p>3<\/p>\n<p>3<\/p>\n<p>11<\/p>\n<p>7<\/p>\n<p>15<\/p>\n<p>17<\/p>\n<p>19<\/p>\n<p>12<\/p>\n<p>8<\/p>\n<p>6<\/p>\n<p>8<\/p>\n<p>10<\/p>\n<p>13<\/p>\n<p>9,10<\/p>\n<p>7<\/p>\n<p>8<\/p>\n<p>15<\/p>\n<p>14<\/p>\n<p>7<\/p>\n<p>12<\/p>\n<p>14<\/p>\n<p>16<\/p>\n<p>15<\/p>\n<p>12,13<\/p>\n<p>16<\/p>\n<p>17<\/p>\n<p>18<\/p>\n<p>You will be assessed on content and mechanics. <\/p>\n<p><strong>Content<\/strong> <strong>(90 points):<\/strong> Each element of this assignment has a correct answer.\u00a0 Your content will be assessed on whether or not you produced a correct diagram, estimate, result, etc. or the degree to how you demonstrate knowledge of scheduling practices in case your diagram, estimate or result are incorrect.<\/p>\n<p><strong>Mechanics<\/strong> <strong>(10 points):<\/strong>\u00a0 The results must include sample calculations (where applicable) and be presented in a professional manner. This is not an academic paper, therefore you do not need to follow APA guidelines.\u00a0 <\/p>\n<\/div>\n","protected":false},"excerpt":{"rendered":"<p>\u00a0 There are 2 parts to this assignment.\u00a0 You can submit two files to the drop box.\u00a0 MS Project (should you have your own license to the software) is not acceptable for completing any part of this assignment. Part 1 Exercise Questions (40 points) Complete exercise questions 1 (5 pts), 3 (5 pts), 5 (10 [&hellip;]<\/p>\n","protected":false},"author":1,"featured_media":0,"comment_status":"open","ping_status":"open","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[31],"tags":[],"class_list":["post-19707","post","type-post","status-publish","format-standard","hentry","category-homework-help"],"_links":{"self":[{"href":"https:\/\/assignmenttutors.net\/blog\/wp-json\/wp\/v2\/posts\/19707","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/assignmenttutors.net\/blog\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/assignmenttutors.net\/blog\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/assignmenttutors.net\/blog\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/assignmenttutors.net\/blog\/wp-json\/wp\/v2\/comments?post=19707"}],"version-history":[{"count":0,"href":"https:\/\/assignmenttutors.net\/blog\/wp-json\/wp\/v2\/posts\/19707\/revisions"}],"wp:attachment":[{"href":"https:\/\/assignmenttutors.net\/blog\/wp-json\/wp\/v2\/media?parent=19707"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/assignmenttutors.net\/blog\/wp-json\/wp\/v2\/categories?post=19707"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/assignmenttutors.net\/blog\/wp-json\/wp\/v2\/tags?post=19707"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}